Reported 07/28/2021 12:00 AM
Project Title

Vidler Collection System Pipeline Replacement

Physical Address View project details and contacts
City, State (County) Golden, CO   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 06/22/21
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for Construction of the following Work: The City of Golden owns and operates the Vidler Tunnel which conveys western slope water into the clear creek basin. Diverted water is collected into a pipeline system that has began to severely degrade. The pipeline is a mixture of below grade and above grade pipe ranging in diameter from 36-inch in diameter to 27-inch in diameter. Pipe materials vary typically from steel to CMP. The contractor will be responsible for removal and replacement of the existing collection pipeline with new Ductile Iron Piping, and associated appurtenances. Total pipeline length is approximately 2400 LF.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents