Similar Projects
Green Island Union Free School District 2020 Capital Project - Phase 2
Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Green Island, NY 12183

Sherburne Chimney Repair
Renovation
Sub-Bidding
$50,000 CJ est. value
Sherburne, NY 13460

Construction of 6'x36' Concrete Stairway with Metal Handrails
Renovation
Sub-Bidding
Wingdale, NY 12594

Design Build Services for Indefinite Quantity Repairs to Miscellaneous Structural Steel,Concrete and Masonry Components
Term Contract, Alteration
Post-Bid
$100,000,000 est. value
New York, NY

Bricks, Concrete
Alteration
Post-Bid
Mineola, NY

Town Hall Generator and Installation
Renovation
Results
$61,000 CJ est. value
Newcomb, NY 12852

Primary Settling Tanks Equipment Replacement and Concrete Repair
Infrastructure
Results
Beacon, NY

Concrete Prestressed Beams
Term Contract
Post-Bid
NY

Concrete Work: Street Reconstruction 2022 - Lincoln Street from 4th Street to 5th Street
Infrastructure
Results
Jamestown, NY 14701

Ready Mix Concrete
Alteration
Post-Bid
Goshen, NY

Precast Concrete Drainage Units
Term Contract
Results
NY

Concrete Repair and Replacement Contract
Term Contract
Post-Bid
Port Washington, NY

Elkendale Farm Concrete Manure Stacking Area
Infrastructure
Results
Genoa, NY

Furnish CR 34 Pre-cast Concrete Bridge Deck as Specified
Alteration
Post-Bid
Syracuse, NY

Drainage and Concrete Construction
Infrastructure, Alteration
Results
Huntington, NY

Last Updated 08/05/2023 09:08 PM
Project Title

Diane Drive Concrete Sidewalk Install

Physical Address View project details and contacts
City, State (County) Binghamton, NY 13904   (Broome County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Broome DDSO is seeking a contractor to install new concrete sidewalk at Diane Dr. The new walkway must be accessible and constructed out of concrete. The successful bidder shall provide all labor and materials necessary to complete the work in a professional manner according to below scope of work and general requirements. A site visit required. Details regarding setting up the site visit are listed after the scope of work and general requirements listed below. Scope of work includes, but is not necessarily limited to the following: 1. Location of sidewalk project in picture below marked in Red. 2. Remove old sidewalk and properly dispose of all materials. Saw cut sidewalk that the new is adjacent to. 3. Install and properly compact 6" of gravel subbase underneath all areas where new walk is to go. Gravel shall be placed in 3" lifts and compacted between each lift. Gravel shall be washed #2 stone. Area prepared shall support a concrete walkway 4' wide going from driveway to existing sidewalk. 4. Properly install concrete walkway in area that was excavated. Concrete walkway shall be composed of 6" of 4500 PSI concrete. Walkway shall be reinforced with welded wire mesh (6" x 6”, #10 x #10). Wire mesh shall be supported during concrete pour to be located midway in the pad. Air shall be entrained in the concrete to no less than 4% of the volume of the total pour and no more than 8%. Walkway should be 4' wide going from driveway to existing sidewalk. 5. Walkway shall have proper control joints placed not more than 5' apart, it shall have an expansion joint where it meets existing sidewalk. 6. Walkway shall have a broom finish or other facility approved non-slip finish. 7. Walkway shall be sealed with a penetrating sealer as soon as allowed by manufacture directions. Sealer shall be approved by facility personal and shall be rated to protect the concrete from the effects of ice melt. 8. Ground shall be sloped away from walkway for at least 36" on either side unless obstructed by a structure. Walkway shall be no more than 2" above ground on either side. Ground shall be left in a smooth rock free and tamped state, but contractor shall be excused seeding due to the lateness in the season. 9. Contractor shall be responsible for providing coverings, additives, or anything else necessary to get walkway to properly cure in inclement weather. Contractor shall not be excused from meeting project deadlines due to weather. 10. Sidewalk shall be fenced off with construction fencing when it is left to cure. 11. All work done shall comply with NYS Building Code and all other applicable codes. 12. All construction related debris are the contractor’s responsibility to removed and dispose of properly. Service-Disabled Veteran-Owned Set Aside: No The Broome DDSO reserves the right to reject any and all quotes. In deciding whether to submit a quote, please be aware the awarded vendor must adhere to time frames outlined in the scope of work.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents