Similar Projects
Cornucopia - Port Wing Construction / Resurface
Infrastructure
Conception
$4,000,000 est. value
Ashland, WI 54806

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Various Sites - Parking Lot Repair Work
Infrastructure
Bidding
$500,000 CJ est. value
Ashland, WI 54806

Various Sites - Parking Lot Repair Work
Infrastructure
Bidding
$500,000 CJ est. value
Ashland, WI 54806

Construction at Green Bay Austin Straubel International Airport - Rehabilitate Runway 18/36 and Dutchman Creek Culverts
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Green Bay, WI 54313

Construction at Green Bay Austin Straubel International Airport - Rehabilitate Runway 18/36 and Dutchman Creek Culverts
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Green Bay, WI 54313

Ashland 4Th Avenue W. Reconstruction
Renovation
Results
Ashland, WI

Paving
Infrastructure
Results
Chetek, WI

Sewers 1-22 Basin Repairs
Infrastructure
Construction
$1,086,000 CJ est. value
Green Bay, WI 54301

Sewers 1-22 Basin Repairs
Infrastructure
Construction
$1,086,000 CJ est. value
Green Bay, WI 54301

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Willow Road Urbanization - PW19-03 - Village of Bellevue
Renovation, Infrastructure
Conception
$754,850 CJ est. value
Bellevue, WI 54311

Last Updated 12/27/2023 07:05 AM
Project Title

Durand - Mondovi

Physical Address View project details and contacts
City, State (County) Durand, WI 54736   (Pepin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $5,877,483 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

20231212031. 1530-05-73 WISC 2024077 Ellsworth - Durand, Pierce/Pepin County Line to CTH P, USH 010 Pepin County 1530-05-83 WISC 2024078 Durand - Mondovi, Durand St to 950' East of Durand St, USH 010 Pepin County Work Summary: Excavation, Base, HMA Pavement, Culvert Pipes, Curb and Gutter, Beam Guard, Pavement Marking, Culvert Construction. Work Type: AD Working Day Contract: 60 Days Guaranty Required: $ 100,000.00 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than ten business days prior to the time set for submitting bidding proposals on a form furnished by the Department. WIDOT - 031 - Durand - Mondovi MBE (1%), WBE (7%), DBE (4%)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents