Similar Projects
Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Eastern Bypass - City Of Huntsville
Infrastructure
Conception
$10,600,000 CJ est. value
Huntsville, AL 35763

Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

Paxton Place Apartments
New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Huntsville, AL 35801

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Constellation Phase I Row Improvements
Infrastructure
Results
$809,415 CJ est. value
Huntsville, AL 35801

Constellation Phase I Row Improvements
Infrastructure
Results
$809,415 CJ est. value
Huntsville, AL 35801

Livano Town Madison
New Construction, Infrastructure - 422,545 SF
Construction
$119,000,000 CJ est. value
Madison, AL 35758

Meadows At Hampton Cove Phase 5
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Owens Cross Roads, AL 35748

Carillon Oaks Madison
Demolition, New Construction, Infrastructure - 35,195 SF
Pending Verification
$9,500,000 CJ est. value
Madison, AL 35758

Everstead Residential Development
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Madison, AL 35758

Holmes Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$17,000,000 CJ est. value
Huntsville, AL 35805

Margaritaville Hotel / Madison
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, AL 35758

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Last Updated 06/27/2023 03:10 PM
Project Title

Green Mountain Booster Station and Pipeline Installation

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35801   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Deadline for Questions: 5:00 p.m. CST on July 28, 2023 The scope of work includes the construction of a high-pressure booster pump station (including site preparation and access) and approximately 2800 LF of buried 10" Sch 40 welded steel pipe. The contractor shall furnish all supervision, labor, materials, supplies, tools, equipment, and transportation necessary to perform the construction called for under this contract in a timely, safe, and professional manner. A cashier's check or a bid bond payable to the City of Huntsville, Alabama, d/b/a/ Huntsville Utilities for an amount not less than 5% of the contractor's bid, but in no event more than $10,000.00, will be required to accompany each bid. A performance bond, a payment bond, a maintenance bond, and insurance will be required prior to execution of the contract. The estimated project duration is 20 months. liquidated damages are included as part of this bid. The right to reject any and all bids is reserved.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents