Similar Projects
Charis Bible College South Campus Student Housing
New Construction - 46,980 SF
Design
$13,000,000 CJ est. value
Woodland Park, CO 80863

UVWS-Laundry Room Upgrades
Demolition, Renovation, Infrastructure
Post-Bid
$30,000 CJ est. value
Pueblo Dep Ac, CO 81001

RFQ Design - Bear Creek Apartment B Building Maintenance 2023
Renovation
Post-Bid
$500,000 CJ est. value
Boulder, CO 80303

RFQ Construction Manager - Construction Manager / General Contractor Services for their Meadowood Housing Project
New Construction, Infrastructure
Post-Bid
Glenwood Springs, CO 81601

Sijan Hall Dormitory
Renovation - 700,000 SF
Pending Verification
CO 80840

RFQ D/B - Consolidate Cadet Preparatory School Dormitory
New Construction
Design
$100,000,000 est. value
USAF Academy, CO 80840

UVWS - Laundry Room Upgrades
Build-out
Post-Bid
$3,000,000 CJ est. value
Pueblo, CO 81001

RFP Construction Manager - Residence One
New Construction, Infrastructure - 190,000 SF
Post-Bid
$91,700,000 CJ est. value
Boulder, CO 80302

Last Updated 10/13/2022 12:04 PM
Project Title

RFP Construction Management / General Contracting (CM/GC) - HLET - Maintenance - 2023

Physical Address View project details and contacts
City, State (County) Boulder, CO 80305   (Boulder County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 13, 2022, a construction manager/general contractor has not been awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023. *The closed solicitation has been included below for reference: The Regents of the University of Colorado Boulder are seeking a General Contractor for services and requests submittal for proposals of General Contractors for the project titled UCB000611-HLET-Maintenance-2023. This project will work to provide maintenance and upgrades to current mechanical, steam heating, plumbing, and electrical systems. Additionally, this project will include interior painting, carpet, and the creation of two ADA student rooms with attached restrooms. The University of Colorado Boulder anticipates using a Construction Manager/General Contractor (CM/GC) approach to project delivery. A Guaranteed Maximum Price (GMP) and an updated project duration schedule will be established by the Architect/Engineer and the Construction Manager/General Contractor in conjunction with the University of Colorado Boulder. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, constructability, and will work closely with the Architect/Engineer and the University of Colorado Boulder throughout the planning, design and construction phases of the project. Construction is estimated to commence 05/22/2022. The process to be used in the selection of the CM/GC is comprised of two steps. STEP I is the Submittal of Prequalification as described in Section II (D). STEP II is the Oral Interview/Cost Proposal as described in detail in Section III. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with Construction Management/General Contracting will evaluate responses to this RFP for both STEPS. Upon completion of the evaluation of the Submittals of Prequalification, a limited number of firms will be invited to the oral interviews. Sealed fee proposals will be required only from those firms who are interviewed and are to be submitted as indicated in this RFP. Both qualifications and cost will be considered in the final ranking of firms with qualifications given 70% of the value of the weighted criteria and fees for the Cost/ Proposal given 30%. CLARIFICATIONS 1. Owner initiated changes to this RFP will be issued under numerically sequenced email addenda. Addenda generally consist of the following items: a. Clarifications b. Scope Changes c. Time and/or Date Changes The schedule of events for the RFP process and an outline of the schedule for the balance of the project is as follows: Advertisement 07/25/2022 Mandatory Pre-submittal Conference and Tour 08/08/2022 Date Email Questions Due 08/15/2022 Date Email Answers Issued 08/18/2022 Submittals Due (Prequalification: Step I) 08/25/2022 Interview Short List Announced 09/08/2022 Sealed Proposal Due (Evaluation and Award: Step II) 09/23/2022 Oral Interviews 09/26/2022 Selection Announced 09/28/2022 Negotiation of CM/GC Contract N/A Contract Approval (projected) 10/26/2022 Anticipated Design Start 08/29/2022 Anticipated CM/GC Start 10/10/2022 Anticipated Construction Start/Finish 05/22/2023 07/31/2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents