Similar Projects
Line of Sight Reconstruction Parking Ramps 38 and 63
Infrastructure
Bidding
$75,000 CJ est. value
Madison, WI 53715

Median Conversion - Concrete 2022
Alteration
Post-Bid
$285,830 est. value
Madison, WI

Quonset Hut - Concrete
Alteration
Post-Bid
$150,000 est. value
Madison, WI 53704

Area 8 Miscellaneous Concrete
Infrastructure
Results
$100,000 est. value
Middleton, WI

Walking Iron Wetland Restoration Walking Iron County Park - Rebid
Infrastructure
Results
$397,500 CJ est. value
Mazomanie, WI 53560

Engineering Hall Roof Replacement - General Bid
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Sprinkler Nitrogen Generator Addition Risser Justice Center
Renovation
Construction
$196,213 CJ est. value
Madison, WI 53703

Crushed Stone and Gravel
Term Contract
Post-Bid
Madison, WI 53715

Slab Repairs Parking Garage 80
Alteration
Results
$300,000 est. value
Madison, WI

Asphaltic Concrete Products
Term Contract
Post-Bid
Madison, WI 53715

Underground Utilities Installation - GC
Infrastructure
Results
$580,000 CJ est. value
Madison, WI 53704

culverts
Term Contract
Post-Bid
Madison, WI 53715

Fire Suppression System Renovation GPC
Renovation
Results
$740,073 CJ est. value
Madison, WI 53706

Food Service Building Renovation
Term Contract, Infrastructure
Post-Bid
$21,250,000 CJ est. value
Madison, WI 53704

Building 6 Remodel - Central Wisconsin Center - AAC
Renovation
Results
$115,444 CJ est. value
Madison, WI 53704

Last Updated 07/05/2023 07:04 PM
Project Title

MEP Lift Station 1 & 2 Rehabilitation

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $162,233 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: the rehabilitation of two lift stations. Lift Station 1 improvements include replacement of pumps, valves, and piping, upgrades to the controls, and raising the wet well lid elevation and adjacent grading for drainage improvement. Lift Station 2 includes replacement of the valve vault and piping with an above grade wet well mounted valve enclosure, upgrades to controls, and raising the wet well lid elevation and adjacent grading for drainage improvement. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Base Bids will be received as a single lump sum bid for: 5) Electrical. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after 21 September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bidding Documents will be available online immediately upon the project being advertised for bid.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents