Similar Projects
Slide Correction
Infrastructure
Conception
$355,000 est. value
IN

Elmwood Drive Bridge Replacement over New Reynolds Ditch
New Construction, Infrastructure
Bidding
$2,000,000 est. value
Lebanon, IN 46052

Slide Correction
Infrastructure
Bidding
$300,000 est. value
Indianapolis, IN

2021 Helen P. Brown Natatorium Bulkhead Replacement
Post-Bid
Fort Wayne, IN 46806

Detention Pond Repair & Maintenance
Infrastructure
Post-Bid
Portage, IN 46368

Meridian Park Detention Basin
Results
Shelbyville, IN

Apron Trench Drain Replacement
Results
Less than $260,000 est. value
Seymour, IN 47274

Springfield Road Culvert Replacement
Construction
Mount Vernon, IN

Various Types of Corrugated Metal and Plastic Pipe for the Year 2022
Term Contract
Post-Bid
IN

Bridge Replacement and Bank Stabilization in Brookshire Golf Club
New Construction
Results
Less than $1,000,000 est. value
Carmel, IN

Goose Creek Regulated Tile Drain
Infrastructure
Post-Bid
Fowler, IN

Small Structure Pipe Lining
Results

Culvert and Bridges
New Construction, Infrastructure
Post-Bid
IN

Whitley County Gateway Industrial Park Drainage Improvements
Results
IN

Construction of the La Porte County Drainage Project
Infrastructure
Post-Bid
La Porte, IN

Reported 07/07/2022 12:00 AM
Project Title

Levi Hawkins No.523 Regulated Drain Reconstruction

Physical Address View project details and contacts
City, State (County) Crawfordsville, IN   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $208,645 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in Montgomery County, Indiana. Levi Hawkins #523 Brown Township T17N, R6W, Sections 11, 13, 14 & 23 Install 875 feet of 36" smooth-corr HDPE pipe Install 762 feet of 30" smooth-corr HDPE pipe Install 2,441 feet of 24" smooth-corr HDPE pipe Install 1,924 feet of 15" smooth-corr HDPE pipe

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents