Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

College Area Sewer and AC Water Main Replacement
Alteration
Bidding
$13,440,000 est. value
San Diego, CA

Sewer and AC Water Group 765A
Infrastructure
Bidding
$16,300,000 est. value
San Diego, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Motherlode Force Main Replacement Phase 3A
Infrastructure
Bidding
$3,900,000 est. value
CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Upgrade Domestic Hot and Cold Water Systems
Term Contract
Bidding
$5,000,000 to $10,000,000 est. value
San Diego, CA 92161

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Replace Drakesbad Water Main/Access Road, NPS-Lavo
Term Contract
Bidding
$250,000 to $500,000 est. value
Chester, CA 96020

Reported 05/06/2022 12:00 AM
Project Title

Lake Cachuma Emergency Pumping Facility Secured Pipeline Project

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA   (Santa Barbara County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under the contract awarded shall consist of the installation of a new bottom-mounted 36-inch diameter intake pipeline and a flexible 36-inch connection pipeline in waters of Lake Cachuma, California. The pipelines are fabricated from high density polyethylene pipe. The main pipeline starts at the intake tower at an elevation of 660 feet where it connects to the flange of an existing steel intake box. The Intake pipeline that is the subject of this work runs offshore approximately 3,600 feet along a selected route where it connects to an intake screen. The connection pipeline ties into the main pipeline approximately 420 ft before the intake screen structure. Both pipelines are to be assembled at a site at Lake Cachuma on shoreline property operated by the U.S. Bureau of Reclamation. The pipelines shall be towed to the installation site and installed by a Contractor selected installation method. B. Services furnished by the Contractor shall be performed in accordance with best industry practice and the plans and specifications included in this Invitation for Bid (IFB), which shall become part of the contract awarded. The services provided by the Contractor shall include all labor, materials, equipment and other incidentals necessary to accomplish the following tasks.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents