Reported 10/07/2021 12:00 AM
Project Title

Joseph Blake Water Treatment Plant Phase 1 Improvements

Physical Address View project details and contacts
City, State (County) Highlands Ranch, CO 80126   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Statements of Qualifications (SOQs) from interested General Contractors, Electrical Subcontractors, and Controls Subcontractors for construction of the Joseph Blake Water Treatment Plant Phase 1 Improvements project at 2500 Plaza Drive, Highlands Ranch, Colorado 80129. The project includes improvements to the water treatment plant as described in the prequalification package, as well as site electrical and network improvements, miscellaneous demolition, miscellaneous yard work, repair and reconstruction of existing improvements affected by the Work, and incidentals for a complete and useable facility.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents