Last Updated 04/24/2021 01:30 AM
Project Title

2 Miles of Crack and Joint Sealing on I-57/70 from the Little Wabash River to Us 40 and 2.75 Miles on i-57/70 from 4th Street Overpass to the North Tri- Level Including Exit and Entrance Ramps

Physical Address View project details and contacts
City, State (County) IL   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2 Miles of Crack and Joint Sealing on I-57/70 from the Little Wabash River to Us 40 and 2.75 Miles on i-57/70 from 4th Street Overpass to the North Tri- Level Including Exit and Entrance Ramps45200100 Foot Joint Or Crack Routing (Pc Concrete Pavement And Shoulder) Base Items 269,524.000 45200300 Pound Joint Or Crack Filling Base Items 126,676.000 67100100 l Sum Mobilization Base Items 1.000 70100420 Each Traffic Control And Protection, Standard 701411 Base Items 4.000 70100825 l Sum Traffic Control And Protection, Standard 701456 Base Items 1.000 70107025 Cal Da Changeable Message Sign Base Items 58.000 70200100 l Sum Nighttime Work Zone Lighting Base Items 1.000 x7010410 Cal Mo Speed Display Trailer Base Items 2.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents