Similar Projects
Brentwood Various Streets and Roads Preservation - 336-31694- City of Brentwood
Infrastructure
Conception
$800,000 est. value
Brentwood, CA 90049

Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose Preschool
New Construction - 20,986 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walnut Creek, CA 94598

Pittsburg High School New Softball Field & Fields Lighting Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

Pittsburg High School New Softball Field & Fields Lighting Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

Streetlight Supplies
Term Contract
Sub-Bidding
San Ramon, CA 94583

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Results
Concord, CA 94520

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

Walden Garden Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Walnut Creek, CA 94597

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Sunset Park Playground Replacement - City of Brentwood
New Construction
Design
$309,000 est. value
Brentwood, CA 94513

Last Updated 07/29/2022 08:05 AM
Project Title

Bicycle Garden - 8007 - City of Antioch

Physical Address View project details and contacts
City, State (County) Antioch, CA 94509   (Contra Costa County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $3,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Projects calls for the construction of a Bicycle Garden As of july 29, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents