Similar Projects
Oxford Drive Water Main and Drainage Improvements
Post-Bid
Bradenton, FL 34205

Water Treatment Services
Post-Bid
Bradenton, FL

Water Main Upgrades - Willow Woods and Lake Estates
Results
FL

Sitework and Utility Installation
Results
Sarasota, FL

Meter Testing Calibrations and Repairs
Post-Bid
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Palmetto Point Water Main Replacement
Results
Palmetto, FL 34221

Flamingo Cay Water Main Replacement
Results
$1,596,072 est. value
Bradenton, FL 34205

Rubonia Water Quality Improvement Project
Results
Palmetto, FL

69th Avenue Water Main Loop
Results
$2,817,000 est. value
Bradenton, FL 34205

Water Meter Testing
Term Contract
Results
Bradenton, FL 34205

Paradise Bay Watermain Replacement
Results
FL

Fire Hydrant Maintenance, Repair and Replacement Services
Term Contract
Results
Longboat Key, FL

Fogarty Subdivision Water Main Replacement
Results
FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Last Updated 05/11/2021 04:45 AM
Project Title

Erie Road - US 301 to US 301 South-North Phase II

Physical Address View project details and contacts
City, State (County) FL   (Manatee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work included in this contract consists of the installation or relocation and upgrades to the potable water utility components associated with the Erie Road Functional Improvement Project. The contractor shall relocate portions of the existing 16-inch trunk water main, various 6-inch thru 10-inch water and sewer mains, install new water services, install new fire hydrants; adjust valve and sewer manhole rim and covers all to avoid conflicts with new infrastructure associated with the new Erie Rd improvements. Deflections and temporary by-pass piping may be required to avoid conflicts with the existing 20-inch force main.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents