Similar Projects
Last Updated | 05/11/2021 04:45 AM |
Project Title | Erie Road - US 301 to US 301 South-North Phase II |
Physical Address | View project details and contacts |
City, State (County) | FL (Manatee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work included in this contract consists of the installation or relocation and upgrades to the potable water utility components associated with the Erie Road Functional Improvement Project. The contractor shall relocate portions of the existing 16-inch trunk water main, various 6-inch thru 10-inch water and sewer mains, install new water services, install new fire hydrants; adjust valve and sewer manhole rim and covers all to avoid conflicts with new infrastructure associated with the new Erie Rd improvements. Deflections and temporary by-pass piping may be required to avoid conflicts with the existing 20-inch force main. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |