Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Forest Grove - PCC Pavement - Grade and Replace
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value
Bettendorf, IA

F33 - HMA Resurfacing/Cold in-Place Recycling
Infrastructure
Bidding
IA

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

PCC Patching
Infrastructure
Post-Bid
IA

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

West Locust Resurfacing - North Michigan to North Clark
Infrastructure
Bidding
$500,000 est. value
Davenport, IA 52804

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

Brick Street Patching Program
Infrastructure
Bidding
$800,000 est. value
Davenport, IA

Eldridge SRF Water Quality Improvements - Permeable Pavement Alleyway
Infrastructure
Post-Bid
Eldridge, IA

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

FY23-24 Contract Sewer Repair Program
Term Contract
Post-Bid
Davenport, IA

Last Updated 04/19/2022 11:41 AM
Project Title

Wisconsin & 35th Street Roundabout

Physical Address View project details and contacts
City, State (County) Le Claire, IA 52753   (Scott County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Wisconsin and 35th Street Roundabout including all labor, materials, and equipment necessary to install an approximate 150’ diameter PCC roundabout with road and trail connections to 35th Street and Wisconsin Avenue, approximately 3,683 square yards of 8” thick PCC pavement, 142 tons of HMA trail, 737 cubic yards of stamped colored 8” thick PCC pavement, storm sewer, intakes and culverts, seeding/fertilizer, traffic control, erosion control and associated cleanup.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents