Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

Central Campus Electrical Upgrade Phase 2 Distribution
Post-Bid
$6,000,000 est. value
Raleigh, NC 27607

Annual Construction Service Contract for Underground Distribution Construction
Term Contract
Results
Less than $1,000,000 est. value
Fayetteville, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

High Point Parking Deck Lighting Replacement
Post-Bid
High Point, NC 27260

34.5-12.47/7.2 kV Substation Switching Facilities and Accessories
Results
Washington, NC

Detention Center Switchgear Upgrades
Post-Bid
Castle Hayne, NC 28429

Electrical Services
Results
Charlotte, NC

Booker Dairy Road North Feeder New Overhead Addition
Addition
Post-Bid
Smithfield, NC 27577

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

115 kV - 24.94/14.4 kV Substation Switching Facilities
Post-Bid
Statesville, NC

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

HVAC Replacements
Post-Bid
Salisbury, NC

Taxiway Lighting and Signage
Results
Less than $743,576 est. value
Gastonia, NC 28056

Replacement Emergency Generator
Post-Bid
Kinston, NC 28502

Last Updated 01/10/2020 08:28 AM
Project Title

Hall Building Mechanical and Electrical Upgrade

Physical Address View project details and contacts
City, State (County) Kenansville, NC   (Duplin County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes but is not limited to the following: This project includes the replacement of the existing electrical distribution system and electrical support for the new HVAC systems. This consists of new 208/120 volt, three-phase, four-wire, underground service. The existing raceways and conductors will remain and be reconnected to the new panelboards. There will be some new exit and emergency lighting required. There will be new highefficiency, rooftop, heat pumps that will replace all the existing, interior, large units. The new units will include dehumidification capability, occupancy-based, demand control ventilation and economizers. The new controls will be connected to the existing on-campus DDC BMS adjustment and monitoring system. There will be some general contractor work related to masonry, painting, and roof repair. The project also includes a new metal door and frame. A roof access ladder will be installed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents