Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Cherry Park Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Centennial, CO 80111

2022 Caley Greenwood Sewer Project
Infrastructure
Bidding
$700,000 CJ est. value
Littleton, CO 80120

Riser Rings
Term Contract
Post-Bid
CO

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

On-Site Improvements
Results
Greenwood Village, CO 80111

2021 Alley Grading and Stabilization
Results
$350,000 to $400,000 est. value
Englewood, CO

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

Centennial Medical Plaza
New Construction, Renovation, Infrastructure - 61,000 SF
Pending Verification
$7,000,000 CJ est. value
Centennial, CO 80112

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

Authoritys Headquarters Plaza Renovation
Infrastructure
Bidding
$500,000 CJ est. value
Aurora, CO 80011

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

2021 Water System Improvement - Central Package
Results
Aurora, CO 80040

New Gate Church Youth Center
New Construction, Infrastructure - 11,832 SF
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80013

Last Updated 09/15/2022 04:32 PM
Project Title

2022 Sanitary Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Littleton, CO 80120   (Arapahoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

CO. Rehabilitation of sewer pipe shall be by either Cured In Place Pipe (CIPP) or Fold and Form Pipe (FFP), including 356 linear feet (LF) of 6-inch sewer pipe, 8907 LF of 8-inch sewer pipe, 371 LF of 12" sewer pipe, and 179 LF of 18" corrugated metal pipe (storm sewer). The work also includes CIPP for FFP spot repairs on sewer pipe on 8, 10, and 12 inch sewer, as well as trimming of protruding service lines (taps), and application of 122 compatible tophats. There is one sewer cleanout to be removed and replaced with a 4' diameter manhole. Verifying and restoring active tap connections (approx. 176) is included in the work. Work is located in both streets and backyards. Access to backyards is to be coordinated with property owners by the Contractor. Bypass pumping and/or flow control, cleaning the lines, pre and post televising (CCTV), and traffic control will also be required for work within streets. General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - FOB Pre-Paid - Installation Required - Insurance Required Bonding Requirements - Bid Bond 5 % Job Location Various locations in Littleton, CO Question Acceptance Deadline 09/13/2022 03:00 PM EDT Questions are submitted online No

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents