Similar Projects
Automatic Meter Reading (AMR) System Installation Services
Infrastructure
Bidding
Less than $750,000 est. value
Sharon, MA

Leak Detection Survey
Post-Bid
Walpole, MA

Leak Detection Contractor
Post-Bid
Franklin, MA

2020 Water Main Improvements Contract 1
Results
Less than $3,800,000 est. value
Canton, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Automatic Meter Reading (AMR) System Supply and Implementation
Post-Bid
Sharon, MA

Water Main Replacement - Summer Street and Union Street
Results
Less than $1,500,000 est. value
Norwood, MA 02062

Hammond Street 2021 Water System Improvements
Post-Bid
$1,500,000 est. value
Brookline, MA 02146

Carroll Avenue and Reed Street Water Main Replacements
Results
Less than $1,400,000 est. value
Dedham, MA

Eastern Avenue, Pine Street, Schiller Road, Ridge Avenue, and Boston-Providence Turnpike Water Main Replacements
Post-Bid
$1,950,000 est. value
Dedham, MA

Water and Roadway Improvements on Various Streets
Results
Less than $3,100,000 est. value
Braintree, MA 02184

Water Work Improvements - Summer Street and Stanley Street
New Construction
Post-Bid
Weymouth, MA

Cleaning and Lining of Water Mains - Prospect, Irving and Forrest Avenue
Results
Less than $750,000 est. value
Norwood, MA 02062

On-Call Water, Drain, Roadwork and General Site Work Services
Post-Bid
$100,000 est. value
Norfolk, MA

Sharon Heights Neighborhood Water Main Replacement - Phase 3
Results
Less than $260,000 est. value
Sharon, MA 02067

Last Updated 12/03/2021 09:47 AM
Project Title

Cold Water Meters and Electronic Receivers/Transmitters

Physical Address View project details and contacts
City, State (County) Milton, MA   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Supply contract (3 years) for cold water meters and electronic receivers/transmitters.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents