Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Replace Bridge LT10 with New Bridge 11J21
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Walker, MN 56484

Replace Bridge LT10 with New Bridge 11J21
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Walker, MN 56484

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

North Smoky Hills Graveling
Renovation
Post-Bid

Norway Lake Dam Rock Riffle
New Construction, Demolition
Results
$2,000,000 est. value
Pine River, MN

Bridge Beam Straightening - By County
Renovation, Term Contract, Infrastructure
Results

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Mosquito and Bungo Creek Bridge Replacements
New Construction
Post-Bid
Walker, MN

Bituminous Removal/Milling and Paving, Concrete C and G /Sidewalks, ADA Ped Ramp
Infrastructure
Results
$915,522 CJ est. value
Walker, MN 56484

Cass Lake Bike Trail
Infrastructure
Post-Bid
Cass Lake, MN

B-364(5) Bridge Repair Enamels and Sealers
Renovation, Term Contract, Infrastructure
Post-Bid
$35,000 to $40,000 est. value

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Northwest 2022 Site Prep & Crop Tree Release
Infrastructure
Post-Bid
Backus, Bemidji, Park Rapids, Warroad, MN 56470

Last Updated 08/12/2022 11:32 AM
Project Title

Guardrail Repair and Replacement on Various Bridges

Physical Address View project details and contacts
City, State (County) Federal Dam, MN 56641   (Cass County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Bridge, Maintenance, Site Development, Steel
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Expected Award Date:09/06/2022 Project Start Date:09/12/2022 Construction Start Date:09/12/2022 Construction End Date:12/09/2022 Guardrail Repair/Replacement on Various Bridges Throughout Cass County Direct questions about this Project, including pre-bid questions, to Joshua Howe at (218) 547-5202 and josh.howe@co.cass.mn.us.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents