Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Crumbling Foundation Engineering Services
Infrastructure
Bidding
Hartford, CT

Structural Engineering Services
Term Contract
Bidding
Hartford, CT

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Engineering, Planning and Development
Post-Bid

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Architect/Engineer (A/E) Consultants
Renovation, Alteration
Bidding
$16,500,000 est. value
Farmington, CT 06032

Architect and Engineering (A-E) Environmental Support Services for Comprehensive Long-Term Environmental Action Navy (Clean) In Navfac Atlantic's AOR, Primarily In The Mid-Atlantic Northeast, Southeast
Post-Bid
$20,000 to $400,000,000 est. value

Architect-Engineer Services for Multiple-Award Indefinite Delivery Indefinite Quantity Contracts
Results
$8,000,000 est. value

EHRM Infrastructure Upgrades, Newington Campus
Renovation, Alteration
Bidding
$20,000,000 est. value
Newington, CT 06111

Affordable Housing Plan Development
Post-Bid
Farmington, CT

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Wayfinding Plan Development
Infrastructure
Bidding
West Hartford, CT

Architectural/Engineering Design and Construction Administration Services for Biscoglio Field Renovations Project
Post-Bid
Berlin, CT 06037

Reported 05/18/2022 12:00 AM
Project Title

Design Services for Improvements to Wolcott Park Bathroom Facility

Physical Address View project details and contacts
City, State (County) West Hartford, CT 06110   (Hartford County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Basic scope of services shall include all phases of design, including a comprehensive pre-design and programming, construction document preparation, bidding, construction administration and commissioning. The Town will provide front-end documents, bid announcements, and project oversight. The Town emphasizes that building improvements do not happen very often and should consider the best long range strategy for the facility including energy efficiency, reduced greenhouse gas emissions, indoor air quality, and ease of operation and maintenance. 1. Design demolishing of existing Bathroom Facility including existing site utilities. 2. Evaluate existing site conditions to determine the best location for the new Bathroom Facility. 3. The Town has a similar but smaller Bathroom Facility and would like to keep with the same basic design. 4. Design new Bathroom Facility with 4 individual gender neutral bathrooms and storage with all new site utilities. 5. New Bathroom Facility’s plumbing and mechanicals are to be all electric with the energy efficient equipment eliminating the need for any fossil fuel equipment. 6. This is a seasonal building and winterization of plumbing lines will need to be considered. Lines pitched back to a central low point and an air connection for blowing lines out. 7. Re-connected all existing site utilities from new building to existing devices (splash pad, site lighting, etc.) 8. Building and adjacent site must designed to ADA Compliance. 9. Submit all paperwork required for available incentives and grants. 10. Conformance to all Federal, State and local codes.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents