Similar Projects
Last Updated | 04/05/2023 09:43 AM |
Project Title | Furnish and Install CNG Compressor System |
Physical Address | View project details and contacts |
City, State (County) | Los Angeles, CA 90012 (Los Angeles County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Los Angeles Harbor Department seeks the purchase and installation of a BAUER C23.20 M-SERIES DUPLEX CNG COMPRESSOR SYSTEM. The purpose of the Pre-Bid Conference is to answer any questions about the requirements contained within the bid and to provide any additional information, which may prove helpful to the prospective bidder, as well as overcome any barriers to participation. The two-year maintenance for parts and labor shall be no less than manufacturer requirements. The Purchasing Agent may deem a bidder non-responsive if the bidder fails to provide all Quotation documents requested by the Port at the Quotation closing date and time. The work to be performed under this Contract shall consist of furnishing all tools, equipment,materials, supplies and manufactured articles, all transportation, services, including fuel, power and water,and essential communications, and the performance of all labor, Work, required calculations testing,inspections or operations, or operations required for the fulfillment of the Contract, in strict accordance withthe specifications, schedules, and Plans, all of which are made a part hereof, and including such detailsketches as may be furnished by the City of Los Angeles Harbor Department Project Manager (PM) fromtime to time during the construction in explanation of said Plans. The Work shall be complete and allmaterial, and services incidentals, quality or not specifically called for quality and conditions noted, in theSpecifications, or not shown on the Plans, which may be necessary for complete and proper construction to carry out the Contract in good faith and a satisfactory manner shall be performed, furnished, and installed by the Contractor at no increase in cost to the City. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |