Similar Projects
West End Apartments
New Construction, Infrastructure
Conception
$150,000,000 CJ est. value
Edwards, CO 81632

West End Apartments
New Construction, Infrastructure
Conception
$150,000,000 CJ est. value
Edwards, CO 81632

The Hoffmann Hotel
New Construction, Infrastructure - 77,000 SF
Design
$30,500,000 est. value
Carbondale, CO 81623

The Hoffmann Hotel
New Construction, Infrastructure - 77,000 SF
Design
$30,500,000 est. value
Carbondale, CO 81623

Wildridge BPS, Tank, and PRV Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Vail, CO 81657

2023 Street Resurfacing Project
Infrastructure
Bidding
$700,000 CJ est. value
Eagle, CO 81631

East Park Improvements and North Restrooms, Harry A. Nottingham Park
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Avon, CO 81620

East Park Improvements and North Restrooms, Harry A. Nottingham Park
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Avon, CO 81620

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Wolf Lot Expansion
Infrastructure
Results
Edwards, CO 81632

Vail Health Northstar Center
Demolition, New Construction, Infrastructure, Build-out - 170,000 SF
Construction
$5,000,000 CJ est. value
Edwards, CO 81632

Vail Health Northstar Center
Demolition, New Construction, Infrastructure, Build-out - 170,000 SF
Construction
$5,000,000 CJ est. value
Edwards, CO 81632

Lionshead Place / Multi-Residential
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Vail, CO 81657

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

Last Updated 04/28/2023 04:04 PM
Project Title

I-70 Pedestrian Bridge Rehabilitation

Physical Address View project details and contacts
City, State (County) Vail, CO 81657   (Eagle County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Vail requests Bids for: Rehabilitation work to the I-70 Pedestrian Bridge over I-70 in the Town of Vail. Work includes concrete spall repair, bridge rail and canopy repair, joint sealing, bridge painting, bridge joint and concrete sidewalk repair. Work is scheduled to be completed between June 5, 2023 and August 31, 2023.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents