Similar Projects
Y1NB--FY21: NRM TIER 2 (PROJ: 675-21-103) Replace Lake Baldwin Cooling Towers
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Orlando, FL 32803

Orange County Public Works Chiller Replacement Building 1 and 2
Alteration
Bidding
$400,000 est. value
Orlando, FL 32839

N041--Sources Sought Notice Install Cooling Tower Gearbox
Post-Bid
Orlando, FL

HVAC Maintenance and Small Projects
Term Contract
Post-Bid
Orlando, FL 32802

Replacement In-Kind of one (1) - Sixty (60) Ton Chiller at the Pompano Turnpike Operations Center
Results
Ocoee, FL 34761

A/C Removal ATaS Lab NAWCTSD
Results
Orlando, FL 32826

Air Duct Cleaning Services
Term Contract
Post-Bid
Orlando, FL 32827

Internal Operations Centre I (IOC I) Communications Room HVAC Improvements
Results
Less than $100,000 est. value
Orlando, FL 32801

RBELC HVAC Server Room Renovations
Post-Bid
Orlando, FL 32800

Data Center HVAC Preventive Maintenance and Repairs Services
Term Contract
Results
Orlando, FL 32827

HVAC Mechanical Services
Term Contract
Post-Bid
Orlando, FL 32802

Preventative Maintenance and Operations of Air Compressors and Dryers for the Orange County Convention Center
Term Contract
Results
FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Correction Building HVAC Unit Replacement
Results
Less than $1,456,440 est. value
Orlando, FL 32839

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Last Updated 09/30/2021 06:59 AM
Project Title

Construction Management at Risk Services for the Seven-Site HVAC System Capital Renewal Project

Physical Address View project details and contacts
City, State (County) Orlando, FL 32814   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000 to $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Renovation of the HVAC systems at Baldwin Park ES, Eagle’s Nest ES, East Lake ES, McCoy ES, Millennia ES, Whispering Oak ES, and Wyndham Lakes ES. 2. The renovation scope of individual sites will vary and may include, but not be limited to, the refurbishment or replacement of existing air distribution equipment and the building automation system, and selected equipment and piping replacement in the central energy plant.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents