Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Concrete Support Authority Wide
Term Contract
Sub-Bidding
Pittsburgh, PA 15219

RFP Construction Manager- Lewis C. Cassidy Elementary School - City of Philadelphia School District
New Construction - 87,272 SF
Post-Bid
$30,000,000 CJ est. value
Philadelphia, PA 19151

Foundations & Slab-On-Grade Bid Package at Pittsburgh International Airport
Post-Bid
Pittsburgh, PA 15233

Tyrone Area High School Loading Dock Renovations Project - General Construction
Results
Less than $184,000 est. value
Tyrone, PA 16686

Portland Concrete
Results
Chambersburg, PA

Freedom Rd (Beaver Co. to Haine School Rd)
Infrastructure
Bidding
$20,000,000 CJ est. value
Cranberry Township, PA 16066

Concrete Replacement Various Locations
Alteration
Post-Bid
Drexel Hill, PA

North Shore Riverfront Park (NSRFP) Tribute to Children (TTC) Masonry and Concrete Repairs
Results
Pittsburgh, PA 15212

RFP D/B - Fiber Optic Network Installation
Infrastructure
Bidding
$999,999,999 CJ est. value
Findlay Township, PA 15126

Precast Concrete for the Warminster Station Platform Replacement
Alteration
Post-Bid
Philadelphia, PA

Exhibit Hall Alcove Composite Slab Repairs
Results
$250,000 est. value
Pittsburgh, PA 15222

General Construction Complete Camping Full Service Loop in Modern Campground (FSC) Bald Eagle State Park
Infrastructure
Bidding
$1,000,000 CJ est. value
Howard, PA 16841

Last Updated 10/17/2022 07:32 PM
Project Title

Lynnwood Avenue Road - Chalf

Physical Address View project details and contacts
City, State (County) Chalfont, PA 18914   (Bucks County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Wage Rate: Yes SCOPE OF WORK 6. PROJECT DELAYS . Ifinclement weather or conditions beyond the control ofthe Contractor and the Owner inhibit the performance ofthis Contract, such delays will be at no additional cost to the Owner. 5. SCHEDULE OF WORK AND LIQUIDATED DAMAGES The Contractor shall notify the Borough ofChalfant and Glenn Engineering not less seven (7) calendar days e ore construction is to start. This project shall be completed not more than thirty (30) consecutive calendar days following the issuance ofthe Notice to Proceed. APTE; Notice to Proceed may be delayed until the Spring, 2023 ifunfavorable weather conditions exist in the Fall, 2022. The liquidated damages will be Three Hundred Fifty Dollars ($350) per consecutive calendar day as a measure of liquidated damages the Owner will sustain for failure ofthe Contractor to promptly complete the work. 7. RESPONSIBILITY FOR BIDDING DOCUMENTS Plans and specifications in the possession of any prospective Bidder are not transferable to another Bidder. If a plan holder wishes to give his set of bidding documents to another potential Bidder, he must first secure the permission of the Engineer. 8. VISITING THE PREMISES Before submitting any proposal, the Contractor shall visit the site and examine, thoroughly familiarize himselfwith the existing conditions and the work to be performed under this Contract. Should any Contractor accept the work, it s all be construed as an acceptance by him of all responsibility and as a guarantee to perform all work required whether or not distinctly shown on the Drawings or specified. 9. CLEANUP WndCShTbTreSmho^d\XSP“sibleforhreSular cleanmS UP ofthe premises. All refuse, dirt, rubbish, and trash ofany LTnAI1 rh dir “d dcbris sha"bc r~iofthe Owner, unless otherwise advised by the Owner. " æ may have savageab,e vaIue’w,n æmam the property ’°- FIELD MEAS! JREMENTS AND DIMENSIONSthe XSlZ COntraCtOr Sha" Verify aU “ntS a‘be submitted to the differenCeS’ WhiCh lna-V be fo“d- "Will be allowed on account ofdifference between d.mensîon^n ^roceedlng with the ^k. No extra compensation The Drawings are generally diagrammatical and indicative ofthe easur®ments and those indicated on the Drawings, all conditions affecting his work. Work tO be Insta,led- The Contractorshall investigatekll workS^Co^wmte^erfonned on Lynnwood Avenue within the Borough ofChalfant, AlleghenyCounty, Pennsylvania. The Borough is located in southeastern Allegheny Countyalong Itoe Penn Lmcoln ar y (L.R./376) approximately ten miles southeast ofthe downtown area ofthe City ofPittsburgh.The followto^tawtag is included herein and made an integral part ofthe Contract SitePlan. Penn DOTApproved Handicap Ramp Details, Bituminous Wedge Curb Details, and Concrete Sidewalk Deta .ktworkmi^^misjnqject hic^ludesth^furrd^hingofall labor, materials, and equipmentrequired for the Perfo™^“of all rehabilitation as indicated in the Contract Documents. The work essentially includes site Prepare™. |ofexisting bituminous pavement, placement ofbituminous pavement, placement ofbituminous wedge type curb, andall required restoration, and all other related appurtenances.4. OWNER/ENGINEER/COUNCIL OF GOVERNMENTS .The Owner referred to in these Contract Documents shall be the Borough ofChalfant The Engineer_shall be das Glenn Engineering & Associates, Ltd. The Turtle Creek Valley Council of Governments (TCVCOG) shalladminister the Contract on behalf ofthe Borough of Chalfant.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents