Similar Projects
Last Updated | 10/17/2022 07:32 PM |
Project Title | Lynnwood Avenue Road - Chalf |
Physical Address | View project details and contacts |
City, State (County) | Chalfont, PA 18914 (Bucks County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Wage Rate: Yes SCOPE OF WORK 6. PROJECT DELAYS . Ifinclement weather or conditions beyond the control ofthe Contractor and the Owner inhibit the performance ofthis Contract, such delays will be at no additional cost to the Owner. 5. SCHEDULE OF WORK AND LIQUIDATED DAMAGES The Contractor shall notify the Borough ofChalfant and Glenn Engineering not less seven (7) calendar days e ore construction is to start. This project shall be completed not more than thirty (30) consecutive calendar days following the issuance ofthe Notice to Proceed. APTE; Notice to Proceed may be delayed until the Spring, 2023 ifunfavorable weather conditions exist in the Fall, 2022. The liquidated damages will be Three Hundred Fifty Dollars ($350) per consecutive calendar day as a measure of liquidated damages the Owner will sustain for failure ofthe Contractor to promptly complete the work. 7. RESPONSIBILITY FOR BIDDING DOCUMENTS Plans and specifications in the possession of any prospective Bidder are not transferable to another Bidder. If a plan holder wishes to give his set of bidding documents to another potential Bidder, he must first secure the permission of the Engineer. 8. VISITING THE PREMISES Before submitting any proposal, the Contractor shall visit the site and examine, thoroughly familiarize himselfwith the existing conditions and the work to be performed under this Contract. Should any Contractor accept the work, it s all be construed as an acceptance by him of all responsibility and as a guarantee to perform all work required whether or not distinctly shown on the Drawings or specified. 9. CLEANUP WndCShTbTreSmho^d\XSP“sibleforhreSular cleanmS UP ofthe premises. All refuse, dirt, rubbish, and trash ofany LTnAI1 rh dir “d dcbris sha"bc r~iofthe Owner, unless otherwise advised by the Owner. " æ may have savageab,e vaIue’w,n æmam the property ’°- FIELD MEAS! JREMENTS AND DIMENSIONSthe XSlZ COntraCtOr Sha" Verify aU “ntS a‘be submitted to the differenCeS’ WhiCh lna-V be fo“d- "Will be allowed on account ofdifference between d.mensîon^n ^roceedlng with the ^k. No extra compensation The Drawings are generally diagrammatical and indicative ofthe easur®ments and those indicated on the Drawings, all conditions affecting his work. Work tO be Insta,led- The Contractorshall investigatekll workS^Co^wmte^erfonned on Lynnwood Avenue within the Borough ofChalfant, AlleghenyCounty, Pennsylvania. The Borough is located in southeastern Allegheny Countyalong Itoe Penn Lmcoln ar y (L.R./376) approximately ten miles southeast ofthe downtown area ofthe City ofPittsburgh.The followto^tawtag is included herein and made an integral part ofthe Contract SitePlan. Penn DOTApproved Handicap Ramp Details, Bituminous Wedge Curb Details, and Concrete Sidewalk Deta .ktworkmi^^misjnqject hic^ludesth^furrd^hingofall labor, materials, and equipmentrequired for the Perfo™^“of all rehabilitation as indicated in the Contract Documents. The work essentially includes site Prepare™. |ofexisting bituminous pavement, placement ofbituminous pavement, placement ofbituminous wedge type curb, andall required restoration, and all other related appurtenances.4. OWNER/ENGINEER/COUNCIL OF GOVERNMENTS .The Owner referred to in these Contract Documents shall be the Borough ofChalfant The Engineer_shall be das Glenn Engineering & Associates, Ltd. The Turtle Creek Valley Council of Governments (TCVCOG) shalladminister the Contract on behalf ofthe Borough of Chalfant. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |