Similar Projects
Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Bidding
Less than $923,540 est. value

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,489,000 est. value

Bridge Structure Repairs (Including Painting) at Various Locations
Results
Less than $960,000 est. value

Scheduled and Emergency Bridge Structural Repairs at Various Locations
Results
Less than $1,267,525 est. value

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $2,859,275 est. value

Scheduled and Emergency Bridge Superstructure Repairs and Related Work (Including Painting) at Various Locations
Results
Less than $1,786,000 est. value

Scheduled and Emergency Bridge Repairs and Related work (Including Painting) at Various Locations on Interstate 90
Results
Less than $3,911,000 est. value

Bridge Superstructure Repairs and Related Work at Two Locations
Results
Less than $1,232,678 est. value

Bridge Substructure Repairs and Related Work at Various Locations
Results
Less than $1,022,705 est. value

Scheduled and Emergency Bridge Shielding and Shoring Tower Work at Various Locations
Results
Less than $360,210 est. value

Bridge Deck Repairs and Related Work at Various Locations
Results
Less than $494,125 est. value

Scheduled and Emergency Structural Bridge Repairs (Including Painting) at Various Locations
Results
Less than $1,284,940 est. value

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,515,000 est. value

Repairs to Old Belchertown Road Over Beaver Brook MassDOT Bridge W-05-024 (0T4)
Results
Less than $225,000 est. value
Ware, MA

Last Updated 03/03/2021 10:15 AM
Project Title

Bridge Replacements and Related Work (Including Signals) Along A Section of Interstate 91 at Interchange 18, BR No N-19-059 (Steel) Over Route 5 and B and M Railroad and BR No N-19-060 (Steel)

Physical Address View project details and contacts
City, State (County) Northampton, MA 01060   (Hampshire County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $47,529,577
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Replacements and Related Work (Including Signals) along a Section of Interstate 91 at Interchange 18, Br. No. N-19-059 (Steel) over Route 5 and B&M Railroad and Br. No. N-19-060 (Steel) over Hockanum Road. "1.000","Ls","Schedule Of Operations - Fixed Price $170,000.00","100." "2.100","a","Clearing And Grubbing","101." "3800.000","Ft","Tree Trimming","102.1" "6700.000","Sy","Brush Cutting & Grinding","102.21" "16.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "8.000","Hr","Invasive Plant Management Strategy","102.33" "1.000","Ls","Access Route Delineation","102.501" "21.000","Ea","Tree Protection – Armoring & Pruning","102.511" "1050.000","Ft","Tree And Plant Protection Fence","102.521" "8.000","Hr","Arborist","102.55" "2.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "2.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "450.000","Lb","Low Alloy Steel Plates","107.02" "1.000","Ls","Demolition Of Superstructure Of Bridge No. n-19-059 (100)","114.1" "1.000","Ls","Demolition Of Superstructure Of Bridge No. n-19-059 (101)","114.2" "1.000","Ls","Demolition Of Superstructure Of Bridge No. n-19-060 (102)","114.3" "1.000","Ls","Demolition Of Superstructure Of Sb Bridge No. n-19-060 (103)","114.4" "27000.000","Cy","Earth Excavation","120." "160.000","Cy","Class a Rock Excavation","121." "3100.000","Cy","Topsoil Excavated And Stacked","125." "2620.000","Cy","Reinforced Concrete Excavation","127.1" "118.000","Sy","Reinforced Concrete Deck Excavation (Full Depth)","127.4" "15.000","Cy","Reinforced Concrete Deck Excavation (Partial Depth)","127.41" "285.000","Sy","Old Pavement Excavation","129.2" "5400.000","Cy","Bridge Excavation","140." "150.000","Cy","Class a Trench Excavation","141." "30.000","Cy","Test Pit For Exploration","141.1" "15.000","Cy","Class b Trench Excavation","142." "15.000","Cy","Class b Rock Excavation","144." "43.000","Ea","Drainage Structure Removed","146." "9900.000","Cy","Ordinary Borrow","150." "750.000","Cy","Subgrade Preparation For Proposed Bridge Foundations","150.21" "9300.000","Cy","Gravel Borrow","151." "2500.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "50.430","Ton","Crushed Stone","156." "210.000","Ton","Crushed Stone For Bridge Foundations","156.1" "25500.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "80.000","Hr","Personal Protection Level c Upgrade","180.02" "80.000","Hr","Licensed Site Professional Services","180.03" "950.000","Ton","Disposal Of Unregulated Soil","181.11" "130.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "130.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "1.000","Ton","Disposal Of Hazardous Waste","181.14" "7.000","Ton","Disposal Of Treated Wood Products","184.1" "66.000","Ea","Catch Basin","201." "14.000","Ea","Manhole","202." "19.000","Ea","Drainage Structure Adjusted","220." "9.000","Ea","Drainage Structure Change In Type","220.3" "19.000","Ea","Frame And Grate - Massdot Bar Type","222." "22.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "43.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "30.000","Ea","12 Inch Hood","224.12" "1.000","Ea","18 Inch Hood","224.18" "20.000","Cy","Removal Of Drainage Structure Sediment","227.3" "2450.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "2150.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "230.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "20.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "7.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "1.000","Ea","15 Inch Reinforced Concrete Pipe Flared End","242.15" "1.000","Ea","18 Inch Reinforced Concrete Pipe Flared End","242.18" "80.000","Sy","Stone For Pipe Ends","258." "560.000","Ft","6 Inch Slot-Perforated Corrugated Plastic Pipe (Subdrain)","269.06" "1200.000","Ft","12 Inch And Under Pipe Removed And Discarded","271.121" "770.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "43700.000","Sy","Pavement Standard Milling","415.1" "500.000","Sy","High Early Strength Cement Concrete Base Course","431." "51000.000","Lb","Calcium Chloride For Roadway Dust Control","440." "130.000","Mgl","Water For Roadway Dust Control","443." "2100.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "2500.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "430.000","Ton","Superpave Intermediate Course - 12.5 (Sic -12.5)","450.31" "1100.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "1500.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "500.000","Ton","Superpave Bridge Surface Course - 9.5 (Ssc-b - 9.5)","450.60" "500.000","Ton","Superpave Bridge Protective Course - 9.5 (Spc-b - 9.5)","450.70" "2600.000","Ton","Asphalt Rubber Gap Graded - 12.5 (Argg - 12.5)","450.80" "440.000","Ton","Hma For Patching","451." "4900.000","Gal","Asphalt Emulsion For Tack Coat","452." "34500.000","Ft","Hma Joint Sealant","453." "45.000","Ton","Hot Mix Asphalt Berm, Type a","470." "190.000","Ton","Temporary Asphalt Patching","472." "11700.000","Ft","Milled Rumble Strip","477." "8300.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "4600.000","Ft","Granite Curb Type Va4 - Straight","504." "80.000","Ft","Granite Curb Type Va4 - Curved","504.1" "90.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "150.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "90.000","Ft","Granite Edging Type Sa","510." "1250.000","Ft","Granite Edging Type Sb - Straight","511.1" "110.000","Ft","Granite Edging Type Sb (Radius 10 Feet Or Less)","512.1" "2.000","Ea","Granite Curb Corner Type b","517." "2500.000","Ft","Edging Removed And Reset","583." "1250.000","Ft","Edging Removed And Discarded","597." "1150.000","Ft","High Tension Cable System","620.016" "170.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "10100.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "2.000","Ea","High Tension Cable System End Treatment","627.016" "5.000","Cy","Footing Cost Adjustments","627.06" "2.000","Ea","Trailing Anchorage","627.1" "8.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "14.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "18.000","Ea","Transition To Bridge Rail","628.24" "9400.000","Ft","Highway Guard Removed And Discarded","630.2" "390.000","Ft","72 Inch Chain Link Fence (Pipe Top Rail) (Line Post Option)","645.072" "14.000","Ea","72 Inch Chain Link Fence End Post","652.072" "200.000","Ft","Chain Link Fence Removed And Stacked","665." "390.000","Ft","Fence Removed And Stacked","669." "179.800","Cy","Stone Masonry Wall In Cement Mortar","685." "45.000","Ea","Silt Sack","697.1" "3350.000","Sy","Geotextile Fabric For Permanent Erosion Control","698.4" "1400.000","Sy","Cement Concrete Sidewalk","701." "50.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "60.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "2.000","Ton","Hot Mix Asphalt Sidewalk Or Driveway","702." "20.000","Ea","Boulders","707.13" "47.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "2.000","Ea","Emergency Mobilization","748.11" "140.000","Cy","Loam Borrow","751." "6150.000","Sy","Compost Topdressing","751.72" "1300.000","Cy","Soil Mix - Bioretention Basin","752.1" "1.000","Ls","Inland Wetland And Mitigation Area","755.35" "1000.000","Sy","Wetland Restoration","755.45" "20.000","Hr","Wetland Specialist","755.75" "1.000","Ls","Wetland Monitoring Reports","755.76" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "5750.000","Sy","Seeding","765." "30200.000","Sy","Seeding - Low Upland Mix","765.411" "4050.000","Sy","Seeding - Upland Part Shade Mix","765.417" "5100.000","Sy","Seeding - Seasonally Flooded Mix","765.554" "29900.000","Ft","Sediment Control Barrier","767.121" "5750.000","Sy","Straw Mulch","767.31" "400.000","Sy","Composted Mulch Over Modified Rock","767.78" "3450.000","Sy","Timber Matting","767.91" "11500.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "7.000","Ea","Maple-Silver 1-1.5 Inches Caliper","776.73" "12.000","Ea","Oak-Pin 1.5-2 Inch Caliper","777.135" "9.000","Ea","Birch- River -Heritage 6-8 Foot Clump","778.156" "18.000","Ea","Dogwood- Gray Twig 2-2.5 Feet","790.532" "10.000","Ea","Dogwood- Redosier 2-2.5 Feet","790.632" "18.000","Ea","Spicebush 2-2.5 Feet","793.713" "13.000","Ea","Sumac Shrub - Fragrant 2-2.5 Feet","794.432" "7.000","Ea","Viburnum - Maple Leaf 2-2.5 Feet","795.001" "23.000","Ea","Viburnum - Arrow Wood 2-2.5 Feet","795.01" "7.000","Ea","Viburnum - Blackhaw 2-2.5 Feet","795.014" "17.000","Ea","Winterberry - Female 24-30 Inch","795.157" "600.000","Ft","4 Inch Electrical Conduit - Type Nm (Double)","801.42" "1000.000","Ft","4 Inch Electrical Conduit - Type Nm (4 Bank)","801.44" "900.000","Ft","5 Inch Electrical Conduit - Type Nm (6 Bank)","801.56" "650.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "950.000","Ft","4 Inch Fre Conduit","804.41" "220.000","Ft","1.25 Inch Hdpe Conduit","805.125" "760.000","Ft","1.25 Inch Hdpe Innerduct","805.126" "80.000","Ft","2 Inch Hdpe Conduit","805.2" "190.000","Ft","4 Inch Grs Conduit","806.41" "6.000","Ea","Electric Manhole - National Grid","811.101" "3.000","Ea","Handhole 48 x 30 x 36 Inches","811.231" "8.000","Ea","Pull Box 12 x 12 Inches - Sd2.031","811.31" "1.000","Ea","Break Into Existing Pullbox - Handhole - Manhole","811.351" "1700.000","Ft","48 Strand Single Mode Fiber Optic Cable","813.251" "280.000","Ft","12 Strand Single Mode Fiber Optic Cable","813.252" "2.000","Ea","Fiber Optic Cable Splice Closure","813.57" "1.000","Ls","Service Connection (Underground)","813.81" "1.000","Ls","Traffic Signal Reconstruction Location No. 1","816.01" "1.000","Ls","Traffic Signal Reconstruction Location No. 2","816.02" "1.000","Ea","Camera Pole Remove And Reset","817.544" "1.000","Ea","Ip Cctv Camera - Ptz Type","819.22" "2.000","Ea","Temporary Camera","819.23" "1.000","Ls","Overhead Guide Sign Removed And Reset","828.011" "360.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "90.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "22.000","Ea","Delineation For Guard Rail Termini","833.7" "1.000","Ls","Supports For Overhead Guide Sign (Od-1) Steel","840.101" "41.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "360.000","Day","Traffic Cones For Traffic Management","851.1" "2520.000","Sf","Safety Signing For Traffic Management","852." "16.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "12850.000","Ft","Temporary Barrier Removed And Reset","853.21" "12400.000","Ft","Temporary Barrier (Tl-3)","853.23" "7900.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "100.000","Day","Truck Mounted Attenuator","853.403" "15.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "11.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "350.000","Day","Temporary Illumination For Work Zone","853.8" "35800.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "4300.000","Sf","Pavement Marking Removal","854.1" "1640.000","Day","Arrow Board","856." "1700.000","Day","Portable Changeable Message Sign","856.12" "40400.000","Day","Reflectorized Drum","859." "4100.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "900.000","Sf","Pavement Arrows And Legends Refl. White (Thermoplastic)","864.04" "120.000","Ea","Slotted Pavement Marker One-Way White","864.31" "80.000","Ea","Slotted Pavement Marker One-Way Yellow","864.32" "80.000","Ea","Slotted Pavement Marker Two-Way White/Red","864.33" "2478.000","Sf","High Friction Surface Treatment - Green (Bike Lanes)","865.01" "480.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "140.000","Ft","24 Inch Wet Reflective Recessed White Line (Thermoplastic)","868.124" "19800.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "8700.000","Ft","12 Inch Wet Reflective Recessed White Line (Polyurea)","868.212" "300.000","Ft","24 Inch Wet Reflective Recessed White Line (Polyurea)","868.224" "18300.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "1500.000","Ft","12 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.212" "22.000","Ea","Traffic Sign Removed And Reset","874.2" "29.000","Ea","Traffic Sign Removed And Stacked","874.4" "240.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "39.000","Cy","Rapid Setting Concrete","909.5" "4883.000","Lb","Steel Reinforcement For Structures","910." "1.000","Ls","Temporary Earth Support System At Rt. 5 & b&m Rr","950.11" "1.000","Ls","Temporary Earth Support System At Hockanum Rd","950.12" "3240.000","Sy","Interim Steel Sheeting","953.2" "1550.000","Ton","Modified Rockfill","986." "490.000","Sy","Special Slope Paving Under Bridge - Cement Concrete","987.3" "1.000","Ls","Control Of Water - Structure No. Bm2","991.1" "1.000","Ls","Control Of Water - Structure No. Bm3","991.2" "1.000","Ls","Control Of Water - Structure No. n-19-059t","991.3" "1.000","Ls","Temporary Works For Temporary Bridge No. n-19-059t","992.301" "1.000","Ls","Temporary Works For Temporary Bridge No. n-19-060t","992.302" "1.000","Ls","Temporary Bridge No. n-19-059t","993.1" "1.000","Ls","Temporary Bridge No. n-19-060t","993.2" "18820.000","Sf","Temporary Protective Shielding At Rt.5 & b&m Rr","994.12" "4340.000","Sf","Temporary Protective Shielding At Hockanum Rd","994.13" "1.000","Ls","Bridge Structure, Bridge No. n-19-059 (Bm2)","995.01" "1.000","Ls","Bridge Structure, Bridge No. n-19-059 (Bm3)","995.02" "1.000","Ls","Bridge Structure, Bridge No. n-19-060 (Bm4)","995.03" "1.000","Ls","Bridge Structure, Bridge No. n-19-060 (Bm5)","995.04" "1500.000","Sy","Mechanically Stabilized Earth Slope","996.33"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents