Similar Projects
2023 Ballfield Complex Enhancements - Rebid
Infrastructure
Bidding
$3,000,000 CJ est. value
Gunnison, UT 84634

Ephraim Utah Temple - Bid Package 3
New Construction, Infrastructure - 40,000 SF
Sub-Bidding
$15,000,000 CJ est. value
Ephraim, UT 84627

RFP Construction Manager - Manti Sixth District Courthouse Administrative Office of the Courts
Demolition, New Construction, Infrastructure - 29,000 SF
Post-Bid
$13,107,870 CJ est. value
Manti, UT 84642

Removal and Replacement of 596 Gallon Steam Heat Exchanger Water Tank
Infrastructure
Post-Bid
$466,000 est. value
Ephraim, UT

World-Wide Water Storage Tank Remediation
Term Contract
Results

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Sanpete County Fairgrounds Restrooms Project
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Manti, UT 84642

DFCM Construction Pre-qualified General UDC Central Utah Correctional Facility (CUCF) Pump House Water and Sewer Improvements
Renovation
Results
$1,700,000 est. value
Gunnison, UT 84634

Skyline Mountain Special Services District Thads Peak Well House and Water Tank
New Construction, Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fairview, UT 84629

Gunnison City New Well Test Drill
Infrastructure
Post-Bid
$550,000 CJ est. value
Gunnison, UT 84634

Mt. Pleasant Sneak Spring Pipeline
Infrastructure
Post-Bid
$550,000 CJ est. value
Mount Pleasant, UT 84647

Outfield Padded Wall
Infrastructure
Post-Bid
$100,000 CJ est. value
Ephraim, UT 84627

Fairview City - Effluent Water Reuse Pipeline
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fairview, UT 84629

Ephraim North Well and Pipeline Project
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Ephraim, UT 84627

Last Updated 12/07/2022 05:55 AM
Project Title

Fairview City- Effluent Water Reuse Project Building Addition, Pump and Tank

Physical Address View project details and contacts
City, State (County) Fairview, UT 84629   (Sanpete County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

no award Separate sealed Bids for the Construction of the FAIRVIEW CITY Effluent Water Reuse Project will be received by Owner The principal items of work are approximately as follows: Sewage treatment plant renovation, Including: Building addition, new grit screen, effluent water booster pumps, and 300K water storage tank The cutoff date for questions will be November 29th at 3:00 pm

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents