Similar Projects
Harvey-Swanson Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

General Residential Construction Contractor
Term Contract
Bidding
Detroit, MI

25-2 Filter Media Replacement
Post-Bid
Waterford, MI

JGHS Remodeling, JGHS and WMHS Sitework, Stevenson MS Sitework
Renovation
Post-Bid
Wayne, Westland, MI 48184

Detroit Arsenal Construction MATOC
Results
$25,000 to $92,000,000 est. value
Warren, MI 48397

Springwells Water Treatment Plant 1958 Settled Water Conduit and Loading Dock Concrete
Results
Detroit, MI 48226

Popeye's
Renovation - 2,510 SF
Construction
Lansing, MI 48911

Industrial Court - Renovation and Addition
Renovation, Addition - 20,307 SF
Pending Verification
Bloomfield Township, MI 48302

My Space Self-Storage
New Construction - 701,700 SF
Pending Verification
Eastpointe, MI 48021

As-Needed ITS Equipment Inspection Services for the I-96 Flex Route Project
Post-Bid
$225,000,000 est. value
MI

2020 Water Treatment Plant Filters 1-3 Improvements Project
Results
Traverse City, MI

Window Washing Services
Term Contract
Post-Bid
Grand Rapids, MI 49504

Southwest Water Treatment Plant Chlorine Scrubber And Raw Water Screen Replacement
Results
Detroit, MI

Birmingham Country Club - New Pavilion
New Construction - 800 SF
Post-Bid
Birmingham, MI 48009

Rehabilitation of Ferric Chloride Feed Systems and Sludge Lines
Term Contract
Results
Less than $7,500,000 est. value
Detroit, MI

Last Updated 05/03/2022 09:09 AM
Project Title

Water Treatment Plant VFD Replacement and Butterfly Value Rebuild

Physical Address View project details and contacts
City, State (County) Mason, MI 48854   (Ingham County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $40,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the removal of an existing electrical cabinet housing an Eaton variable frequency drive (VFD) for High Service Pump No. 1 and replacing it with a new Danfoss FC202 AQUA Series Custom Drive 125 hp VFD, including free-standing cabinet and the rebuilding of an existing 16-inch Val-Matic 150B butterfly valve. All work is located within the Mason Water Treatment Plant, 1417 Avery Lane, Mason, MI 48854. Construction shall be coordinated (to the extent practical) with the draining of the 1-million-gallon ground storage tank.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents