Similar Projects
Park Pavilion Updates - Park TBD - City of Kaukauna
Renovation, Infrastructure
Conception
$400,000 CJ est. value
Kaukauna, WI 54130

Riverview Stormwater Detention - City of Kaukauna
Infrastructure
Conception
$2,000,000 CJ est. value
Kaukauna, WI 54130

Innovation Court Apartments
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Appleton, WI 54914

Stephensville - Shiocton Const / Resurf
Infrastructure
Design
$3,000,000 CJ est. value
Hortonville, WI 54944

Interceptor System Rehabilitation - Heart of the Valley Metropolitan Sewerage District
Infrastructure
Bidding
$21,800,000 CJ est. value
Kaukauna, WI 54130

Valvoline / Appleton
New Construction, Infrastructure - 2,080 SF
Bidding
$550,000 CJ est. value
Appleton, WI 54913

Lawrence University - Whiting Field Phase 1 - Track and Field Site Redevelopment Project
Infrastructure
Post-Bid
$240,000 CJ est. value
Appleton, WI 54915

Everglade Road Dredging - Phase 3
Infrastructure
Post-Bid
$180,000 CJ est. value
Greenville, WI 54942

Maintenance Department Mailroom
Infrastructure
Results
Appleton, WI 54911

Prairie Hill Park Playground
Renovation, Infrastructure
Results
$300,000 est. value
Appleton, WI 54914

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Appleton Public Library Construction/Renovation BU 32C Landscaping / Irrigation
New Construction, Infrastructure - 120,000 SF
Pending Verification
$4,531,723 CJ est. value
Appleton, WI 54911

U-Haul - Commerce Crossing / Kaukauna
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Kaukauna, WI 54130

Desnoyer Street Area Utillity Relay (Seymour, Ducharme, Blackwell, Desnoyer) - City of Kaukauna
Infrastructure
Conception
$1,250,000 CJ est. value
Kaukauna, WI 54130

T. Grand Chute, College Ave Des-Bld / BRRPL
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Appleton, WI 54914

Last Updated 06/23/2023 09:06 AM
Project Title

Leachate Storage Tank and Loadout System

Physical Address View project details and contacts
City, State (County) Appleton, WI 54911   (Outagamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work is per the specifications developed by SCS Engineers. Reference the following for the scope – ? Technical Specifications Project #25223132.03 Leachate Storage Tank and Loadout System Outagamie County Northeast Landfill dated May 12, 2023 (100 pages) ? Construction Drawings, Leachate Loadout System Outagamie County Northeast Landfill dated June 2023 (26 pages)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents