Similar Projects
River Wall Repair, Mechanics Park - ENG-FY23-011 - City of Biddeford
Infrastructure
Conception
$600,000 CJ est. value
Biddeford, ME 04005

Crosswalks/Lights/Sidewalks - Washington St - ENG-FY23-015 - City of Biddeford
Infrastructure
Conception
$624,000 CJ est. value
Biddeford, ME 04005

1 Diamond Mixed-Use
New Construction, Infrastructure - 84,000 SF
Design
$129,000,000 CJ est. value
Biddeford, ME 04005

1 Diamond Mixed-Use
New Construction, Infrastructure - 84,000 SF
Design
$129,000,000 CJ est. value
Biddeford, ME 04005

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Statewide Geotechnical Drilling
Infrastructure
Results

On Call Maintenance Paving
Infrastructure
Results

Cape Arundel Cottage Preserve Phase 6
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Arundel, ME 04046

Eastview Village Condo Flats
New Construction, Infrastructure - 75,182 SF
Pending Verification
$20,000,000 CJ est. value
Saco, ME 04072

507 Main Street Multi-Tenant Commercial Building
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Saco, ME 04072

Harbor Access/Boat Launch - Vines Landing - ENG-FY23-017 - City of Biddeford
Infrastructure
Conception
$425,000 CJ est. value
Biddeford, ME 04005

Pearl Street Redevelopment
New Construction, Infrastructure
Design
Biddeford, ME 04005

Crushing of Concrete and Pavement
Infrastructure
Post-Bid
Wells, ME 04090

Bridge Header Replacement and Mill and Fill
Renovation, Infrastructure
Results
$800,000 est. value
Baldwin, Cornish, ME

Last Updated 09/05/2023 08:33 AM
Project Title

Joint National Guard Vehicle Maintenance Shop

Physical Address View project details and contacts
City, State (County) Saco, ME 04072   (York County)
Category(s) Commercial, Government/Public, Green Building, Heavy and Highway, Sewer and Water
Sub-Category(s) Gas Station, LEED Certified, Maintenance, Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $24,692,742 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 09, 2023, this project has started construction. Site work started in September 2022, and preload was finished in February of 2023. Foundation and shell have started this month. At this time, all subcontractor trades have been let. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents