Similar Projects
Clintonville-Collins Neighborhood Roadway Improvement
Infrastructure
Bidding
$835,000 est. value
South Elgin, IL

2022 Sealcoating Program
Infrastructure
Bidding
$160,000 est. value
Montgomery, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

(1.937-Mile) Improvement Consists of Crack Cleaning and Sealing in the Existing Concrete Pavement Between Traffic Lanes, Curb and Gutter, Restriping Pavement Marking
Results
IL

Bolz Road Reconstruction from Amarillo Drive to Kennedy Drive
Results
Carpentersville, IL 60110

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

2022 Crack Flling Program
Infrastructure
Bidding
$49,000 est. value
Batavia, IL

2021 Street Program
Post-Bid
Elburn, IL

Tyler Road Watermain Improvements 2021
Results
Saint Charles, IL

2022 MFT Streets Program
Infrastructure
Bidding
$430,000 est. value
Pingree Grove, IL

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

2021 Kane County Chip Seal
Results
Saint Charles, IL

2022 Eastside Resurface Program - Various Streets
Infrastructure
Bidding
$177,000 est. value
Carpentersville, IL

Roadway Resurfacing
Post-Bid
Saint Charles, IL

Last Updated 05/16/2022 04:04 PM
Project Title

Fay`s Lane and Whispering Oaks Lane Water Main and Roadway Improvements

Physical Address View project details and contacts
City, State (County) Sugar Grove, IL 60554   (Kane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $870,545
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Fay's Lane and Whispering Oaks Lane Water Main and Roadway Improvements, which consists of installing approximately 900 lineal feet (LF) of 12" and 700 LF of 8" ductile iron water main (DIWM), resurfacing approximately 1,760 LF of Whispering Oaks Lane and Fay's Lane, installing 1,040 LF of new curb and gutter alignment along Fay's Lane, and related appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents