Similar Projects
Pumping Services
Bidding
Glendale, AZ 85301

Sanitary Sewer Collection System Rehabilitation Pipes 2017-2018
Post-Bid
Tempe, AZ 85281

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

Germann Road Water-Sewer and Meridian Road Water
Results
Less than $1,828,445 est. value
Queen Creek, AZ

Waste Line Replacement at Mountain View High School
Results
$450,000 est. value
Mesa, AZ 85213

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

Construction Manager at Risk Miller Road Trunk Sewer
Results
Buckeye, AZ 85326

Water/Wastewater Pumps (Sales, Service and Repairs)
Term Contract
Post-Bid
Mesa, AZ 85210

Riverview Soccer Fields Utility Relocation
Results
Less than $1,976,415 est. value
Mesa, AZ 85211

Grease Trap Cleaning Services
Post-Bid
Peoria, AZ

Combs Road Sewer and Water Line Extension Phase 4 - Kenworthy Road Sewer Line
Results
Less than $1,006,159 est. value
Queen Creek, AZ 85142

Water and Sewer Service Line Protection Program
Term Contract
Post-Bid
Tempe, AZ

Combs Road Sewer and Water Line Phase 3 - Sewer Line
Results
Queen Creek, AZ 85142

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Sewer and Storm Drain Cleaning and Inspection Services
Results
Phoenix, AZ

Last Updated 04/15/2021 07:45 AM
Project Title

38th Street Relief Sewer: Phase 2 - 38th Street

Physical Address View project details and contacts
City, State (County) Paradise Valley, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 3,500 linear feet of new 8-inch sanitary sewer line along 38th Street and 38th Place from Lincoln Drive to Bethany Home Road. The proposed 8-inch gravity sewer main will also tie into the existing City of Phoenix wastewater collection system upstream of Lift Station 54 and allow for its abandonment. In addition, work includes installation of approximately 21 new sewer manholes, approximately 400 linear feet of 6-inch sewer services, two drainage inlets with approximately 80 linear feet of new 18-inch storm drain crossing, work to adjust the intersection of 38th Place and Berridge Lane to a “T” intersection, restoration of signing and striping, and miscellaneous landscaping restoration. This project is within Town of Paradise Valley right-of-way.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents