Similar Projects
Facility Hardening
Bidding
$748,066 to $816,686 est. value
Ormond Beach, FL 32174

Belle Glade Senior Center
Post-Bid
Belle Glade, FL 33430

SVC-OHDOORS/2021/2 - Repairs and Maintenance to Overhead Doors, Gates and Automatic Door Equipment
Term Contract
Post-Bid
Punta Gorda, FL 33950

P.B.C. Convention Center - Loading Dock Doors Replacement Project
Results
Less than $550,000 est. value
West Palm Beach, FL 33401

Hardening Wind Retrofit of Fire Stations 2, 3 and 4
Results
Less than $193,000 est. value
Palm Bay, FL 32907

OBCC Window Shutters - Fema Project #4337-65-R
Post-Bid
Daytona Beach, FL 32114

Indoor/Outdoor Public Address System
Results
Gainesville, FL 32609

POCC Window Shutters - Fema Project #4337-61-R
Post-Bid
Daytona Beach, FL 32114

Replacement of Windows and Doors for the Hazard Mitigation Grant
Results
Less than $386,000 est. value
Pembroke Pines, FL 33027

WVCC Window Shutters - Fema Project #4337-54-R
Post-Bid
Daytona Beach, FL 32114

Window Replacement Project
Results
Eagle Lake, FL 33839

SEVCC Window Shutters - Fema Project #4337-352-R
Post-Bid
Daytona Beach, FL 32114

Security Window Film and Installation
Results
Land O Lakes, FL 34638

Purchase and Installation of Doors and Windows for the J.R. Dean WTP
Post-Bid
Florida City, FL 33034

Maintenance and Repairs of Overhead Roll-Up Doors
Results
Orlando, FL

Last Updated 10/28/2021 10:25 AM
Project Title

Purchase and Installation of Door Hardware at Gilchrist Elementary and Woodville Pre-K - 8 School

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32305   (Leon County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Price shall include replacement door hardware, removal of existing hardware, and installation of new hardware. 2. The Contractor shall ensure frequent pick-up of all refuse, rubbish, scrap materials, and debris that results from their operations. All rubbish, scrap, etc. shall be removed from the premises. Upon completion of their work, the Contractor shall remove all work materials, tools, equipment, and surplus materials (including replaced hardware) from the work site and leave in ready-to-use condition. The District is not responsible for the loss of tools or supplies.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents