Similar Projects
Sherburne County Jail Expansion - Sherburne County
Addition, Demolition, Renovation, Infrastructure
Conception
$10,000,000 CJ est. value
Elk River, MN 55330

CSAH 22 - Baugh Street - Reconstruction From CR 64 To CR 65 - Anoka County
Infrastructure
Conception
$7,970,000 CJ est. value
Nowthen, MN 55330

Median Cable Barrier Installation
Infrastructure
Design
$1,900,000 CJ est. value
Clear Lake, MN 55319

Median Cable Barrier Installation
Infrastructure
Design
$1,900,000 CJ est. value
Clear Lake, MN 55319

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2023 Surface Improvement Projects
Infrastructure
Post-Bid
$450,000 CJ est. value
Orrock Township, MN 55309

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

2022 Surface Improvements
Infrastructure
Construction
$3,793,349 CJ est. value
Orrock Township, MN 55309

2022 Surface Improvements
Infrastructure
Construction
$3,793,349 CJ est. value
Orrock Township, MN 55309

Norland Truck Sales
New Construction, Infrastructure - 30,300 SF
Pending Verification
$4,000,000 CJ est. value
Big Lake, MN 55309

Norland Truck Sales
New Construction, Infrastructure - 30,300 SF
Pending Verification
$4,000,000 CJ est. value
Big Lake, MN 55309

Highway 169 Frontage/Backage Road Improvements - II-01 - City of Elk River
Infrastructure
Conception
$1,500,000 CJ est. value
Elk River, MN 55330

Big Lake Station / Big Lake
New Construction, Infrastructure
Design
$61,000,000 CJ est. value
Big Lake, MN 55309

Slim Chickens / St. Cloud
New Construction, Infrastructure - 3,236 SF
Post-Bid
$1,500,000 CJ est. value
Saint Cloud, MN 56304

Last Updated 02/14/2024 11:34 AM
Project Title

2023 Business Park Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Becker, MN 55308   (Sherburne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $7,575,142 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2023 Business Park Pump Station Improvements Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. A Contractor responding to these Bidding Documents must submit to the City/Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply. Major quantities for the Work include: 17,000 SQ YD Full Depth Reclamation 6,000 TONS Bituminous Surfacing 5,300 CU YD Aggregate Base 24,000 CU YD Common Excavation 1,000 LIN FT 8-Inch PVC SDR 35 Pipe Sewer 320 LIN FT 21-Inch PVC PS 115 Pipe Sewer 360 LIN FT 24-Inch PVC PS 115 Pipe Sewer 8,100 LIN FT 14-Inch HDPE Forcemain 450 LIN FT Jacked Steel Casing (20 - 42-Inch) 3,800 LIN FT B618 Concrete Curb and Gutter 16 ACRE Turf Establishment 2 EACH Decommission Lift Station 1 LUMP SUM Triplex Lift Station This Work shall be subject to minimum wages and labor standards in accordance with the State of Minnesota. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Owner.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents