Last Updated | 01/06/2023 03:13 PM |
Project Title | RFP Engineering - Perpetuation - Resurfacing Germantown - Mequon |
Physical Address | View project details and contacts |
City, State (County) | Mequon, WI 53097 (Ozaukee County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected July 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $8,999,999 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2023. *The closed solicitation has been included below for reference: Perpetuation project of 3.5 miles to mill and overlay 4" of asphalt on STH 57 /167 from Buntrock Ave. to CTH W in the city of Mequon in Ozaukee County. Multiple curb ramps that will need to be evaluated and improved. Additional maintenance items include cleaning, repairing & replacing inlets & manholes, plus spot curb & gutter, and sidewalk replacements. Project also includes signing coordination, traffic management plan and pavement marking improvements. Other tasks include supplemental survey, coordination for Public Involvement, TMP, DNR, utilities and coordination with maintenance and bridge sections (both region and BOS). Project ID 2697-00-07: Specific work will include new monotubes at STH 57/167 & Cedarburg Rd. intersections. Multiple curb ramps in the area will need to be evaluated and improved. Anticipated Construction Cost: $8,000,000-$8,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Resurfacing C Mequon, W Mequon Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |