Similar Projects
CDBG-DR Project - St. Augustine Boulevard and Cypress Road Drainage Improvements
Bidding
$1,619,078 est. value
FL 32086

C-25 Canal Banks Repairs
Infrastructure
Bidding
FL

Channel 1 Concrete Panel Replacement West of 66th Street
Post-Bid
Pinellas Park, FL 33781

Construction of the Poinciana High School Football Field Drainage Repairs
Post-Bid
Kissimmee, FL 34744

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Precast Concrete Structures - Area 1 Drainage Project
Results
Fernandina Beach, FL 32034

Ongoing and As-Needed Fabric-Formed Concrete Revetment Mats
Term Contract, Infrastructure
Bidding
New Port Richey, FL

Retention Pond Work Early Education
Renovation
Post-Bid
Panama City, FL

Sunbeam Road at Abbey Glen Circle Drainage Improvements
Results
Less than $185,395 est. value
Jacksonville, FL 32202

As Needed Class III Reinforced Concrete Pipe and Gaskets for Pipe Joints
Infrastructure
Bidding
New Port Richey, FL

Arcola Lakes - Bioretention Area
Post-Bid
Less than $98,000 est. value
Miami, FL 33147

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Design - Build Services for Horizontal/Civil Engineering (Horizontal) Design-Build Projects
Infrastructure
Bidding
Jacksonville, FL

Whirlpool Road Dirt Road Paving Driveway Pipe
Post-Bid
FL

Hampstead Drive Culvert Replacement
Results
$100,000 to $250,000 est. value
Brooksville, FL 34602

Last Updated 07/20/2021 10:28 AM
Project Title

Howard Avenue Drainage Improvements - Phase II

Physical Address View project details and contacts
City, State (County) Dade City, FL 33525   (Pasco County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $138,171
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Howard Ave Drainage Improvements project consisting of: Site improvements at an existing stormwater pump station, replacement of submersible pump with motor and control panel, installation of concrete ditch blocks, reworking an existing storm ditch and installation of reinforcement mat

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents