Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Water Heater Replacement
Alteration
Bidding
Denver, CO 80228

Replacement of Second Boiler at Historic Courthouse
Alteration
Bidding
CO

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Rangeview Boiler Replacement
Post-Bid
Aurora, CO 80013

SB267 Replace Boiler Economizer, Central Plant, CMHIP
Results
Less than $40,000 est. value
Pueblo, CO 81003

16" Sleeve Valve and Spool Refurbishment
Results
Berthoud, CO 80513

Greeley Central HS Boiler and DHW Replacements
Post-Bid
Garden City, CO 80631

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Cu Anschutz Pn19-129407-Scpp Pre-Qualified Only
Post-Bid
Less than $220,238 est. value
Denver, CO

Refurbish Hydronic Heat System at Johnson Building
Results
Rangely, CO 81648

Elevator and Conveyance Inspection Services
Post-Bid
Brighton, CO

As-Needed HVAC, Mechanical and Plumbing Services
Term Contract
Results
Aspen, CO 81611

Boiler Replacement at Arvada Head Start
Post-Bid
Arvada, CO 80003

Last Updated 07/23/2021 02:04 PM
Project Title

2 Boilers at Manaugh Elementary School

Physical Address View project details and contacts
City, State (County) Cortez, CO 81321   (Montezuma County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement and installation of 2 boilers at Manaugh Elementary School at 300 East Fourth Street, Cortez, Colorado 81321. * 2 new Lochinvar # PBN1002-M9 natural gas, water boilers * 2 new Taco or Bell & Gossett pumps for primary and secondary piping * 1 air and dirt separator * New CAT IV stainless vent system to match specs for high boiler efficiency * Include all supplies necessary for complete pipe & venting assembly (i.e. controls, connections, wiring, roof penetrations, etc. GAS BOILER INSTALLATION: * Modify existing pipe design and venting to meet specs for new boilers * All supplies and materials necessary for complete assembly of specified system above * Start-up test of units, per manufacturer’s recommendations * To include all necessary inspections, permits and state registrations * Existing boilers to be removed in-house / do not include in your bid

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents