Similar Projects
Cold Milling, Full Depth Reclamation, Asphalt Concrete Surfacing, Pipe Work, Modify Intersection, Guardrail
Infrastructure
Bidding
$17,110,000 CJ est. value
Scotland, SD 57059

Cold Milling, Full Depth Reclamation, Asphalt Concrete Surfacing, Pipe Work, Modify Intersection, Guardrail
Infrastructure
Bidding
$17,110,000 CJ est. value
Scotland, SD 57059

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Highway 46 Water Main Relocation
Infrastructure
Results
$1,190,000 est. value
Tabor, SD

Bon Homme County Asphalt Surface Treatment
Infrastructure
Bidding
$2,000,000 CJ est. value
Tyndall, SD 57066

Underground Infrastructure Inspection
Infrastructure
Post-Bid

AC Surfacing, Approach Slab, Guardrail - PCN - 04F0 Yankton Area
Infrastructure
Results
SD

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Cold Milling, Asphalt Concrete Resurfacing (38K Tons), Pipe Work
Infrastructure
Results
SD

Water Treatment Plant
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Springfield, SD 57062

2022 Asphalt Surface Treatment
Infrastructure
Results
$810,651 est. value
Tyndall, SD

High School CTE Addition and Locker Room Renovation
Addition, Demolition, Build-out, Renovation, Infrastructure - 2,750 SF
Post-Bid
$135,000 CJ est. value
Tyndall, SD 57066

2022 Street and Water Improvements Project
Infrastructure
Results
$563,325 CJ est. value
Springfield, SD 57062

Last Updated 01/31/2023 07:37 AM
Project Title

Mill, AC Resurfacing, Pipe Work

Physical Address View project details and contacts
City, State (County) Tyndall, SD 57066   (Bon Homme County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $5,040,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD37 - Fm SD50 to the Bon Homme/Hutchinson Co Line Length 11.9 As of January 31, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill, AC Resurfacing, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents