Similar Projects
Almost Home Daycare
New Construction - 7,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Nottingham, MD 21236

P3005, Design Build, Child Development Center, Joint Base Andrews, Camp Springs, MD
New Construction, Demolition - 48,296 SF
Design
$10,000,000 to $25,000,000 est. value
Camp Springs, MD

Construction of the New Youth Center
New Construction - 8,495 SF
Bidding
Crisfield, MD 21817

Canton Celebree
Renovation - 10,000 SF
Bidding
Baltimore, MD 21224

Everbrook Academy
New Construction - 12,500 SF
Post-Bid
$3,250,000 est. value
Perry Hall, MD 21128

The Greensboro Judy Center Project
New Construction - 7,375 SF
Post-Bid
Greensboro, MD 21639

Limited to NAVFAC Washington SB MACC Holders for Joint Base Andrews P-3005 Child Development Center
New Construction
Results
MD

The Goddard School
New Construction - 14,465 SF
Construction
$1,500,000 est. value
North Bethesda, MD 20852

Primrose School
New Construction - 12,000 SF
Construction
$2,400,000 est. value
Silver Spring, MD 20906

40TEN
New Construction - 16,275 SF
Pending Verification
Baltimore, MD 21224

Tribeca at Camp Springs - Day Care Center
New Construction, Renovation - 7,700 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Camp Springs, MD 20746

L.A. Learning Center
Renovation - 13,211 SF
Design
Waldorf, MD 20602

Lightbridge Academy & Vanilla Box
Renovation - 10,275 SF
Post-Bid
Lutherville, MD 21093

Bright Horizons Child Care Center
New Construction - 18,696 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Baltimore, MD

Celebree Of Rockville
Build-Out - 13,510 SF
Pending Verification
Rockville, MD 20852

Last Updated 06/14/2022 10:11 AM
Project Title

Loyola Early Learning Center Addition

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21202   (Baltimore City County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Bids by Invitation.
Project Status Design Development, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 3 story, 25,000 square foot addition to an existing school. As of December 16, 2021, this project is in the early planning stages, and received approval from the Baltimore Commission for Historical and Architectural Preservation. An architect has been selected. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Pre-School/Daycare, 3 Stories Above Grade, 25,000 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents