Similar Projects
Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Foxhill Park Project
Results
$350,000 to $375,000 est. value

Village Park Tennis Court Replacement
Results
$150,000 to $200,000 est. value
Evans, CO 80620

Playground Surface Repair - Martinez Elementary School
Post-Bid
Greeley, CO 80631

Redtail Ranch Master Planned Community
New Construction
Pending Verification
Erie, CO 80516

Country Fields Playground Replacement
Results
Erie, CO

Coalridge Neighborhood Park Renovation
Post-Bid
Frederick, CO 80530

2020 Park Amenities Bid
Post-Bid
Frederick, CO 80530

Outdoor Fitness Area Demo and Build
New Construction
Post-Bid
Firestone, CO

Phase 1.0 Centennial Park Improvements
Results
Greeley, CO

East Greeley Parks Natural Area Park Improvements
Bidding
Greeley, CO

Playground Engineered Wood Fiber Installation
Post-Bid
Greeley, CO 80631

Koshio Park Renovation
Renovation
Results
Less than $250,000 est. value
Fort Lupton, CO

Construction Manager at-Risk / GC - Erie Community Park Final Phase
Results
Less than $5,350,000 est. value
Erie, CO 80516

Centennial Park Improvements - Phase 0.5
Results
$209,530 to $336,144 est. value
Greeley, CO 80631

Last Updated 02/26/2021 05:50 PM
Project Title

Centennial Park Improvements Design Build

Physical Address View project details and contacts
City, State (County) Frederick, CO 80530   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Centennial Park was originally developed in 2005-2006 in conjunction with drainage improvements throughout the area. The park has access issues and does not meet Americans With Disabilities Act (ADA) requirements. The goal of this project is to add amenities that complement the current uses of the park while adding other improvements that will continue to bring life to the park. The design and construction management services requested herein are to produce a range of conceptual options with cost analysis for each and a final design with construction level drawings and specifications followed by construction management during construction.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents