Project Title | Robinwood Park Soccer Fields and Skate Park Lighting |
Physical Address | View project details and contacts |
City, State (County) | Bartlesville, OK 74003 (Washington County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $350,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of furnishing all materials, labor, and expenses necessary to construct the project as called for in the specifications on file in the Engineering Department, 3rd Floor, City Hall, 401 S. Johnstone, Bartlesville, Oklahoma 74003, (918) 338-4251. The major work on the project shall consist of reinstalling sixteen (16) existing MUSCO light poles and metal halide fixtures and installing electrical power for them. The light poles were salvaged from a recent baseball field renovation. Twelve (12) light poles are planned for installation at Robinwood Park Soccer Fields and four (4) light poles are planned for installation at the Lee Lake Skate Park. Proposals shall be accompanied by a five percent (5%) bid guarantee. Each Bidder must deposit with his Bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. All Bids must be made on the required Bid form and Bidder shall be a record plan holder with the City. The Owner reserves the right to waive any informality or to reject any or all Bids and select the lowest and best bid. Bids received more than ninety-six (96) hours (excluding Saturdays, Sundays and Holidays) before the time set for receiving bids as well as bids received after the time set for receipt of bids will not be considered, and will be returned unopened. No Bidder may withdraw his Bid within 30 days after the actual date of the opening thereof. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |