Similar Projects
Butler Avenue Water Man Extension
Infrastructure
Bidding
$750,000 to $800,000 est. value
Doylestown, PA

AMI System Installation
Results
$600,000 est. value
Morrisville, PA 19067

Furnish and Provide Services for Replacement of Existing Water Mains
Results
Levittown, PA

2020 Water Main Replacement
Results
$75,000 to $100,000 est. value
Morrisville, PA 19067

Central System Water Main Extensions
Results
$116,000 to $119,000 est. value
Doylestown, PA 18901

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pressure Reducing Valve Vaults
Results
Sellersville, PA 18944

Village Park Water Quality Improvements Project
Results
Levittown, PA 19058

Moland House Water Main Extension
Results
Less than $408,364 est. value
Warminster, PA 18974

2020 Water System Improvements Project
Results
Less than $1,800,000 est. value
Ivyland, Warminster, PA 18974

Grove and Banks Street Water Main Replacement
Results
$175,000 to $200,000 est. value
Morrisville, PA 19067

Cherry Blossom Drive Watermain Extension
Results
$250,000 est. value
Richboro, PA 18954

Juniper Street Storm Sewer and Water Main Replacement
Results
Quakertown, PA 18951

2020 Water System Improvements Project - Phase 2
Results
$2,000,000 est. value
Warminster, PA 18974

2021 Infrastructure Improvement Project Group
Results
Lansdale, PA 19446

Last Updated 05/12/2021 12:55 PM
Project Title

Water Service Installation - Contractor Services

Physical Address View project details and contacts
City, State (County) Warminster, PA   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes providing equipment, labor and materials on a “Time and Material” basis for the installation of water services for the Warminster Municipal Authority (Authority) during the contract period of 730 calendar days. The hourly rates for equipment and labor shall be provided for the categories included in the Form of Proposal. Bids will be compared based on an 8-hour day. All materials shall be provided “at cost” with the specified mark-up applied.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents