Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

HVAC Replacements
Post-Bid
Salisbury, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - HVAC System
Results
Cullowhee, NC 28723

PC Air Units
Post-Bid
Charlotte, NC 28208

Chancellor's Residence HVAC Renovation
Results
Chapel Hill, NC 27514

Chiller Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

Hope Mills and South View Middle School Gymnasium HVAC Renovation Project
Results
Hope Mills, NC 28348

Reported 11/30/2019 12:00 AM
Project Title

30-35 Ton Chill Water Unit Rental

Physical Address View project details and contacts
City, State (County) Atlantic Beach, NC 28512   (Carteret County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: The Offeror shall: 3.1: Provide a trailer mounted air-cooled chiller unit that is capable of providing 30-35 tons of cooling capacity. The existing chill water unit that this temporary chill water unit is replacing meets the following specification: Carrier M# 30RAP0355FA07F04, S# 2811042756. 3.2: Connect the electrical service into the electrical disconnect that feeds the existing chill water unit. (Note: Coast Guard personnel have already disconnected the electrical service to existing chill water unit). Electrical requirement: 208 VAC, 3 phase, 60 Hz. The unit is being fed electrically by a 250A Breaker and disconnect. 3.3: Connect the temporary chiller chill water lines into the existing chill water lines being fed to and from the existing Carrier 30 ton chill water unit. (Note: The existing chill water lines have already been disconnected from the existing chill water unit). 3.3: Conduct any/all necessary start up procedures in order to make this chill water unit fully functional and supplying chill water to the mechanical systems inside the Administrative Building. 3.4: Rental contract will run until 31 December 2020 with option to extend if required. Unhooking/Breakdown of mechanical systems and removal from site shall be included in the cost of this contract.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents