Similar Projects
South Belton Sewer Service Phase II
Bidding
Belton, TX

Sanitary Sewer, Storm Sewer, Water, and Drainage
Post-Bid
TX

J045--CTX VA Grease Trap
Post-Bid
Temple, TX 76504

Wastewater System Improvements
Results
Less than $224,000 est. value
Rogers, TX 76569

Bird Creek Interceptor Phase 4
Results
Less than $14,600,000 est. value
Temple, TX 76501

Warrior's Path Reconstruction, Phase I
Results
$2,850,000 est. value
Harker Heights, TX 76548

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Waterline Rehabilitation Phase III
Results
Less than $3,150,000 est. value
Killeen, TX 76541

Bird Creek Interceptor Phase 4B (Pecan Valley to Daniels Drive)
Results
Less than $10,707,002 est. value
Temple, TX 76501

G Wilson Water Main Project
Results
Less than $1,100,000 est. value
Belton, TX 76513

South I-35 Waterline
Results
Less than $1,260,000 est. value
Belton, TX 76513

FY 2019-2020 Wastewater System Improvements
Results
$223,000 est. value
Rogers, TX 76569

36 Inch Valve Replacement Project
Results
Killeen, TX 76543

Cameron - Wastewater Rehab - 2019 Community Development Block Grant
Results
Less than $265,000 est. value
Temple, TX 76501

Loop 121 Utility Relocations
Results
$1,000,000 est. value
Belton, TX

Last Updated 12/07/2019 12:24 AM
Project Title

2018 Water System Improvements

Physical Address View project details and contacts
City, State (County) Holland, TX 76534   (Bell County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $222,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Installation of temporary erosion controls. 2. SWPPP 3. Traffic Controls 4. Installation of a new 6” waterline including all excavation, pipe, fittings, restraints, thrust blocking, embedment, backfill, compaction, locating tape and grading. 5. Connections to existing waterlines. 6. Installation of 2” and 6” gate valves including all excavation, connections, restraints, thrust blocking, backfill, compaction, concrete cap and grading. 7. Installation of fire hydrants including 6” lead, valve and box. 8. Replacement of single water services. 9. Gravel, asphalt and concrete repairs.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents