Similar Projects
Murphy Oil #5754 / Searcy
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Searcy, AR 72143

White County Overlay No. 6 (S)
Infrastructure
Bidding
$500,000 CJ est. value
Searcy, AR 72143

Construction of Schedule I: 2-bay Box Hangar and Schedule II: Apron Construction, Apron Overlay, and Miscellaneous Pavement Repair
New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Searcy, AR 72143

New 4 Bay Fire Station a Metal Building With Office and Training Room
New Construction, Infrastructure - 8,000 SF
Post-Bid
$4,000,000 CJ est. value
Bald Knob, AR 72010

Ramsey Landing Access Parking Lot Overlay
Infrastructure
Results
$49,625 CJ est. value
Searcy, AR 72143

Ramsey Landing Entrance Road Overlay
Infrastructure
Results
$281,410 CJ est. value
Searcy, AR 72143

Bennett Office Space Parking Lot
Alteration
Construction
Searcy, AR 72143

City of Beebe Wastewater Treatment Plant Improvements 2023
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Beebe, AR 72012

Pangburn Overlay (S)
Infrastructure
Results
$322,747 CJ est. value
Pangburn, AR 72121

Romance Area Master Meter, Pump Station, and Water Main
New Construction, Renovation, Infrastructure
Post-Bid
$1,750,000 CJ est. value
Searcy, AR 72143

Higginson Overlay (S)
Infrastructure
Results
$259,493 CJ est. value
Higginson, AR 72143

Asphalt Paving
Infrastructure
Post-Bid
$400,000 CJ est. value
Beebe, AR 72012

Concrete Sidewalks, Curb and Gutter, Earthwork, Asphalt Surfacing, Drainage
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Pangburn, AR 72121

Tidal Wave Auto Spa / Searcy
New Construction, Infrastructure - 3,251 SF
Post-Bid
$1,000,000 CJ est. value
Searcy, AR 72143

Wastewater Collection Rehabilitation
Infrastructure
Post-Bid
$2,570,349 CJ est. value
Pangburn, AR 72121

Last Updated 04/06/2023 11:09 AM
Project Title

Beebe WWTP

Physical Address View project details and contacts
City, State (County) Beebe, AR 72012   (White County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 3.5 MGD Average Daily Flow Sequencing Batch Reactor Wastewater Treatment Plant including; furnishing, construction, and installation of yard piping, mechanically cleaned bar screen structure and equipment, influent pump station structure and equipment, vortex grit removal equipment, Sequencing Batch Reactor structure, equipment, and controls, UV Disinfection equipment and building, Operations and Chemical Feed Building, site work, electrical and controls work, and miscellaneous appurtenances as detailed in the project plans and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents