Similar Projects
Milledgeville Streetscape - Phase IV
Results
Milledgeville, GA

Gwinnett Street Widening
Results
Savannah, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Phase I Entrance Road
Results
Savannah, GA 31400

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Jekyll Island Road Resurfacing
Results
Jekyll Island, GA 31527

Southern Region Disaster Recovery Support BPA
Results

Last Updated 01/24/2020 09:30 AM
Project Title

Sanitary Sewer, Street and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Blakely, GA 31723   (Early County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacing two manhole sections of existing sewer, repaving three short streets, lowering and extending an existing 24" RCP storm drain and regrading and lining approximately 700 feet of drainage ditch. The work under this contract consists of various infrastructure improvements in and adjacent to North Avenue in North Blakely. Improvements fall under three categories: 1. Street Improvements: Three short streets between North Avenue and Church Street to the west are to be regraded, paved and lined with new rollover curb. 2. Drainage Improvements: An existing 700 foot drainage ditch that starts between North Avenue and Church Street, crosses North Avenue and terminates at North Main Street will be regraded, widened and lined with tied concrete block mats. An existing 24-inch RCP storm drain under North Avenue will be relocated and lowered and another existing 24” storm drain under North Main Street will be clean of accumulated sediments. 3. Sanitary Sewer Improvements: Two manhole sections of existing 8-inch sanitary sewer and all the 4-inch service laterals on North Avenue from the main up to within 5 feet of the houses are to be replaced.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents