Similar Projects
O'Reilly Auto Parts (BN2) / Benton
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Benton, AR 72015

Road Runner #1043 Renovation
Addition, Renovation, Infrastructure
Design
$800,000 CJ est. value
Bryant, AR 72022

Traskwood Main St. Overlay (S)
Infrastructure
Bidding
$550,000 CJ est. value
Traskwood, AR 72167

Traskwood Main St. Overlay (S)
Infrastructure
Bidding
$550,000 CJ est. value
Traskwood, AR 72167

Mill and Asphalt Overlay of East Sevier Street
Infrastructure
Post-Bid
Benton, AR 72015

High Performance Cold Mix
Infrastructure
Post-Bid

Sevier Street - Geyer Springs Road (CONC PVMNT PRES)
Infrastructure
Results

Springlake Roundabout
Infrastructure
Results
Benton, AR

Pinnacle Point at Bryant
New Construction, Infrastructure - 82,000 SF
Construction
$22,000,000 CJ est. value
Alexander, AR 72002

Pinnacle Point at Bryant
New Construction, Infrastructure - 82,000 SF
Construction
$22,000,000 CJ est. value
Alexander, AR 72002

Aria Convenience Store
New Construction, Infrastructure - 3,500 SF
Pending Verification
$1,000,000 CJ est. value
Bryant, AR 72022

Midtown Bryant - Phase 3
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bryant, AR 72022

Main Street Rehabilitation Sidewalk Project
Infrastructure
Post-Bid
Benton, AR

Statewide CLRS Improvements
Infrastructure
Results

Lombard Heights
New Construction, Infrastructure
Construction
$48,000,000 CJ est. value
Bryant, AR 72022

Last Updated 03/27/2023 08:08 AM
Project Title

The Village at Whisper Valley

Physical Address View project details and contacts
City, State (County) Alexander, AR 72002   (Saline County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status All Sub-Bids Received, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

There are a total of 355 units, 88 buildings. All buildings will be wood framed. As of March 27 2023, all bids have been received. Construction to start May 1 2023.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents