Last Updated 02/04/2022 08:06 AM
Project Title

White Pine Trail Extension and Trailhead

Physical Address View project details and contacts
City, State (County) Cadillac, MI   (Wexford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $480,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: Trailhead asphalt parking reconstruction, curb and gutter, sidewalk and sidewalk ramps, storm sewer, lighting, steel fabrication and installation of clock tower, site amenities, and pavement markings, including all necessary appurtenances and restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents