Similar Projects
BP4 and BP5 - Ball Fields and Indoor Practice Facility
Post-Bid
Ypsilanti, MI

Gun Lake Park Improvement Services
Post-Bid
Wayland, MI

Bird Elementary School Paving Expansion and P-CEP JV Track and Field Replacement Project
Results
Plymouth, MI

Island Park Community Arts Pavilion
Results
Less than $53,000 est. value
Mount Pleasant, MI

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

Early Childhood Education Center
New Construction - 58,000 SF
Construction
$15,000,000 est. value
Detroit, MI

Laketon Township Horton Park Improvements DLZ Project
Post-Bid
Muskegon, MI 49445

Brandon Park Expansion
Results
Ortonville, MI

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

2020 Softball Facility Improvement
Post-Bid
Big Rapids, MI

Natural Playground and ADA Upgrades to Peasley Park
Results
Less than $89,945 est. value
Huntington Woods, MI

2020 Sf Projects – Running Track Replacement
Post-Bid
Onekama, MI 49675

Design/Construction Services for Mckinley Park Improvements Project
Results
Flint, MI

Mckinley and Farnumwood Playground Installation Services
Post-Bid
Flint, MI 48503

Practice Football Field Improvements
Results
Dearborn, MI

Last Updated 07/08/2020 04:00 PM
Project Title

Veteran`s Memorial Park Pool Waterslide Stair Improvements

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48103   (Washtenaw County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the repair, cleaning, and painting of the Veteran’s Memorial Park Pool Slide. The slide is located in the northwest corner of the pool and is comprised of a steel suppor structure, a fiberglass slide, and a wooden railing system. The scope of this project includes the removal of the wooden railing with care taken to not damage the railing to allow for reuse, the erection of proper containment, the complete paint removal and cleaning of the entire steel support structure, the removal and replacing in kind or repairing of all steel members that are determined structurally inadequate by the engineer or have more than 10% loss of section due to rust including the known deteriorated sections listed below, the complete painting of the entire support structure, and the reattaching of the existing wooden railing. The aluminum stair treads and landings are to be removed and safely stored for reuse and shall not be painted. Care is to be taken to ensure 100% of rust is removed in the cleaning process and shall be approved by the engineer prior to painting operations.

Details

Division 11 - Equipment, Play Field Equipment and Structures.
Division 13 - Special Construction, Amusement Park Structures and Equipment, Water Slides.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Site Improvements.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents