Similar Projects
SR-171 - 2650 West to Redwood Road
Infrastructure
Bidding
$500,000 to $1,500,000 est. value
Salt Lake City, UT 84104

DFCM Construction Pre-Qualification (General, Electrical, Mechanical, Roofing, Paving and Civil)
Post-Bid
Less than $3,500,000 est. value
Salt Lake City, UT 84129

Library Plaza Paver Replacement
Post-Bid
Salt Lake City, UT

Sandy City 2020 Overlay Project
Results
Sandy, UT 84070

Mill and Overlay 2020 Project
Results
Murray, UT 84123

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

City Wide Park Walkway Safety SLC Library Plaza Paver Replacement
Post-Bid
Salt Lake City, UT 84111

300 East (11400 South to 11800 South) Reconstruction Project
Results
Draper, UT 84020

Asphalt Pavement Repair
Post-Bid
UT

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

2020 Fall Crack Seal Project
Post-Bid
Sandy, UT 84070

20J: GHID Headquarters Asphalt Improvements
Results
West Valley City, UT 84119

SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

SR-210 Widening and Grit Mill Parking Lot Transportation Alternatives
Results
$500,000 to $1,500,000 est. value
UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Last Updated 11/23/2021 03:37 AM
Project Title

Local Streets Reconstruction 2022 - 2

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: street improvements (i.e. replacement of concrete flatwork, ADA ramps, and C&G; replacement of pavement and reclaimed aggregate with cement stabilizer) and storm drainage upgrades. The locations of the work are: Liberty Avenue from Lake Street to 800 East, Roosevelt Avenue from 600 East to 700 East, Kensington Avenue from 800 East to 900 East and Bryan Avenue from 800 East to 900 East in Salt Lake City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents