Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Upgrade Mechanical Systems
Bidding
Less than $250,000 est. value
River Grove, IL 60171

MVCC Building H Natatorium RTU Replacement
Bidding
Tinley Park, IL

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

2020 HVAC Replacement
Results
Wheeling, IL 60090

HVAC Upgrades
Renovation
Bidding
Chicago, IL 60605

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Des Plaines HVAC Improvements
Bidding
Des Plaines, IL

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Last Updated 08/20/2020 09:18 AM
Project Title

Replace Chiller Bundle at Farragut HS

Physical Address View project details and contacts
City, State (County) Chicago, IL 60623   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chiller's Bundle is leaking and needs replacement. Remove and discard remaining oil and freon from circuits. Disconnect and remove existing Chiller Bundle. Provide crane to lift off existing bundle and bring up new bundle. Provide new Chiller Bundle (York Chiller) and install. Perform nitrogen leak check on both circuits. Place a vacuum on system and leave on overnight for a tight seal. Charge both circuits with an approximate total 180 LBS of 410 A Refrigerant. Test to ensure safe and efficient operations. Perform factory start up upon completion

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents