Similar Projects
Omega Alpha Academy - A/C Unit System
Alteration
Bidding
Douglas, AZ 85607

Washington School HVAC Units Replacement Project
Alteration
Bidding
Less than $100,000 est. value
Winslow, AZ 86047

Cooling Tower Replacement
Post-Bid
Goodyear, AZ 85395

J043--644 - Annual Chiller, Condensers, & Evaporator Testing
Post-Bid
Phoenix, AZ 85012

Boiler Inspection Services
Results
Phoenix, AZ

Franklin at Brimhall Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85206

SFB Multiple HVAC Project
Alteration
Bidding
Buckeye, AZ 85326

HVAC System Coil and Air Handler Cleaning
Term Contract
Post-Bid
Phoenix, AZ 85003

Shepherd Junior High Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85205

Tucson Magnet High School Air Handler Replacement Project
Alteration
Bidding
Tucson, AZ

HVAC Conversion at Solomon Elementary School
Post-Bid
Solomon, AZ 85551

Emerson Elementary Cooling Tower Repairs
Term Contract
Results
Mesa, AZ 85201

Qualified Select Bidder's List - HVAC Mechanical Yard at Milenio
Alteration
Bidding
Tempe, AZ 85284

Chemical Water Treatment
Post-Bid
Luke Air Force Base, AZ 85309

Highland Arts Elementary Cooling Tower Repairs
Results
Mesa, AZ 85213

Last Updated 10/05/2021 11:28 AM
Project Title

Installation of a 480V, 10-ton HVAC Unit in Building 500 shop, Maricopa, AZ

Physical Address View project details and contacts
City, State (County) Maricopa, AZ 85138   (Pinal County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of existing evaporative cooler Installation of a 480V, 10-ton HVAC unit in Building 500 shop. Schedule with facilities department. Supply and install a 480V, 10-ton Ruud (or equivalent) heat pump. Supply a angle iron stand to elevate the unit off the ground surface. The supply air duct will adapt from the unit and tie into the existing cooler duct at the wall penetration. Duct in the return air duct through the wall and install a return air grill, Unit shall have a manual outdoor air damper The exterior duct will be internally lined with insulation. Supply and install new thermostat mounted by the return air grill and supply and install a garage door interlock to shut down the A/C when the door is opened. Supply and run all necessary electrical for the new unit and provide new outdoor disconnect. Check unit for proper operation after installation. Supply Location Personnel with operations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents