Similar Projects
Township & Fire Department Offices New Hall
New Construction
Conception
Walhalla, MI

New Central Fire Station
New Construction - 22,000 SF
Conception
Port Huron, MI

New Fire Station 4
New Construction - 12,000 SF
Design
Ann Arbor, MI 48104

Fire Stations 1 & 3 Remodels
Renovation
Design
Auburn Hills, MI 48326

DTW ARFF Station 100 Women's Locker Room Improvements at Detroit Metro Airport
Renovation - 345 SF
Bidding
$202,000 CJ est. value
Romulus, MI 48242

Taylor Police Department Locker Room Renovation
Renovation
Bidding
$400,000 CJ est. value
Taylor, MI 48180

Port Huron Fire Station 1
New Construction, Infrastructure - 18,000 SF
Sub-Bidding
$9,000,000 CJ est. value
Port Huron, MI 48060

Renovations To Fire Station 2, 3303 Baldwin Rd
Renovation
Post-Bid
$450,000 est. value
Grand Blanc, MI 48439

Facility Maintenance for DPD Lyndon Facility
Renovation
Post-Bid
$650,000 est. value
Detroit, MI 48227

Fire Station 32 Fascia Project
Renovation
Results
Brighton, MI

Police Training Academy - Atrium Renovations
Results
Lansing, MI 48917

Fire Station 2 Refurbishment - Chesterfield Township
Renovation
Pending Verification
$2,000,000 CJ est. value
Chesterfield, MI 48047

New Fire Station - Township of Cleon
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Copemish, MI 49625

Kollen Park Station Renovation
Renovation
Conception
Holland, MI 49423

Oakland County Sheriff Substation
Renovation - 7,300 SF
Design
Commerce Township, MI

Last Updated 11/10/2022 04:11 PM
Project Title

RFQ Design - Police Department Renovation Project

Physical Address View project details and contacts
City, State (County) West Bloomfield, MI 48323   (Oakland County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Please complete the attached request for qualifications and submit per the instructions on the first page.In addition, please submit a complete RFQ package (with attachments) to Rick Erickson. Submissions beyond the stipulated timeline will not be accepted. Question Acceptance Deadline 11/01/2021 05:00 PM EDT Questions are submitted online No The method of Contractor Selection has not been Determined at this time

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents